2205 Sacramento Street, Unit 101
Condominium unit
-
Jul 1985
To install fireplace in living room.
-
Sep 1988
Install aprroced gas heater in existing fireplace.
-
Oct 1991
Dry rot damage, remove tile, small patch, sheetrock.
-
May 1992
Repair dry rot sub-floor bathrm. install toilet, tile, tub.
-
Aug 1994
Remove sheetmetal sheating & wood siding in light well.
-
Jan 2006
Replace existing 34 windows (aluminium) with inserts marvim windows at south side (back of the building) replace 16 existing aluminuum windows at court yards (lightwells) south east, north west. south west, north east with 15 certaiimteed byrm vinyl sindows and one cardem maruim windows at one unit. replace.
-
Jul 2013
Work in common area only- retaining wall repair.
-
Feb 2015
Strengthen existing failing retaining wall @ rear of property with new retaining wall; maher n/a.
-
Nov 2015
Soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. replace existing foundation with new foundation, new shearwalls per plans. n/a maher ordinance.
-
Apr 2023
West lightwell- not visible from street- replace 4 windows in the same rough openings: remove existing siding, install new cox plywood- install new fiber cement siding approx 1340 sq ft.
-
Nov 2024
Upgrade existing fire alarm ystem in sprinkled building to comply with 2022 cbc/cfc, nfpa 72 and sffc sec 1103.7.6.1. install new facu with radio to monitor system. detector and pull station at facu horn/strobes in common areas. install low frequency sounders inside sleeping rooms.
4 nominal $1 street-space or sidewalk permits are omitted from the timeline. 4 expired permits are not shown.