1500 Sutter Street
Pacific Heights · San Francisco, CA 94109
-
Dec 1984
Remodel existing building to original victorian style.
-
Jan 1985
Partial removal of partitions & fixtures.
-
Jan 1985
Facade; remove existing stucco from facade on sutter.
-
Apr 1985
Removel of stucco from 2 exterior facades.
-
Jun 1985
Food service facility.
-
Jul 1985
Continued existing restaurant use.
-
Dec 1985
Fabricate and install range hood.
-
Jan 1986
Install type i grease.
-
May 1986
See plans attached (install awning infront of entrance).
-
Jun 1991
Non electric sign.
-
Sep 1996
Underpinning per plans.
-
Jun 2007
Voluntary accessible upgrades on ground floor, forth floor to include accessible entry doors, restroom, 2 guestrooms. registration, door pressures and signage. flourescent light per t-24.
-
Sep 2007
Revision to app # 200706204489 - for ground floor restroom configuration. fire alarm and sprinkler work under sep. application.
-
Feb 2008
Reinstall and reconnect 4 existing storbes and 2 existing horn/storbes in remodelling bathrooms and guest rooms on floors 1 and 5.
-
Feb 2008
Comply with physical inspection report# 3r-4817. for administrative purpose only. no work required. all work performed under permit application 2007/09/28/3991 & permit application 2007/06/20/4489.
-
Sep 2008
Phase 1-replace of fire control panel and one for one fire protection devices for compatibility. connect existing water flow, tam, per switch and door holders to new panel and monitor per nfpa72. central system monitoring.
-
Dec 2008
Phase 2-install mini horns in every guest room, additional notification devices, 3 heat & 1 smoke detectors to upgrade hotel to comply with current requirements. connect new devices to existing control panel & monitor per nfpa72 central system monitoring.
-
2009
Recorded in the city's 2009 survey of Japantown as the Hotel Majestic, among the older and taller hotel buildings in the neighborhood, in Queen Anne or Edwardian-era dress.
-
Apr 2010
To obtain final inspection for work approved under app #200812047833. all work is complete.
-
Apr 2021
Voluntary fa replacement in common areas only initiating devices. replace of existing facu, smoke detectors, heat detectors, pull stations, monitor and relay modules.
-
Aug 2026
Replace 125 double hung windows with marvin ultimate clad douoble insert windows. u factor.30 5ghc.2 with o.g. lugs. no openings to be changed.
4 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early tenants. Submit an update