1624–1626 Vallejo Street
10-unit apartment building
-
1890
Built.
-
1920s
A Russian drama society club met at this address in the 1920s.
-
Mar 1991
Retile kitchen, replace appliance, replace counter top.
-
Aug 1995
Interior rmdl (kitchen, bathrm, walls & finishes), replace door.
-
Mar 1998
Replace tub, value, bathtub tile enclosure, install floor tile.
-
Jul 1998
2nd floor deck above rebuilt landing 1st floor.
-
Feb 2002
Replace & repair roof of third floor-create deck area.
-
Sep 2002
Rev. appl#200202260105 install glass guardrail & new sliding glass door assembly.
-
Sep 2003
Remodel kitchen (new cabinets & appliances)remodel bathrm (new shower stall, new vanity, steam bath &.
-
Apr 2004
Install 14 replacement windows- in kind visible street.
-
Jun 2006
Remove and replace rotted stringers, treads and risers on lower portion of staircase, replace rim joists at 1st landing, replace same deck boards at 1st landing.
-
Nov 2010
One unit: remove and replace kitchen cabinets. remove and replace bath fixtures and tile. all lighting to comply with code cec 150k. no stuctural. no windows, doors, or wall changes.
-
Mar 2011
#3 - replace 2 windows, size for size, not visable from street with vinyl double pane windows, u value =0.40. no change wall or door, maintain rescue egress in bedrooms.
-
Mar 2012
Retile existing tub and shower & bath floors. reconfigure closets. replace vanities, exhaust fans.
-
Jul 2012
Reroofing.
-
Jun 2013
#2 - kitchen remove tile floor and install new tile. tile back splash, approx 8'x12. bathroom: remove existing tile replace with new tile. leave existing tub, demolition old stove and sink, replace new hood. replace with new plainess, replace in kind. the same location.
-
Mar 2016
Soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4.
-
Feb 2017
One unit- remove/replace int incl demolition non-struct walls, install new recessed lighting thru-out, install new kitchen appliances, new casework, renovate existing bath incl remove/replace plumbing fixtures in kind. add new powder room (toilet and sink), add new washer/dryer closet, painting & hall closet.
-
Oct 2022
Remodel of existing three bathrooms and existing kitchen in same footprint, no stuctural changes, no change to the front facade of the building.
-
Mar 2023
Rebuild exterior stairs at rear of building.
DBI holds 44 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 44. 6 of them are nominal $1 street-space or sidewalk permits. 6 expired or cancelled permits are not shown.
Nearby
- 1515 Vallejo Street Same street
- 1730 Vallejo Street Same street
- 1520 Green Street Around the corner
- 2209 Van Ness Avenue Around the corner
- 1641 Green Street Around the corner