Permit history
-
Mar 1983
Solar system.
-
Sep 1984
To bring building full compliance with the provisions.
-
Oct 1987
Install aluminum windows.
-
Mar 1991
Parapet correction epr plan of t.f. fitzgerald.
-
Apr 2005
Reroofing.
-
Jul 2006
6 demolition old cabinets, install new ones (no changes to 2 partitions 2 window. none structural kitchen remodel new sink, new outlets, new bathroom tiles.seven units.
-
Aug 2006
Revision to permit application 2006/07/24/7390 to increase valuation from $45, 000 to $75, 000. pay additional fees on $30, 000 per applicants request.
-
Oct 2006
Three units only.non structural, new cabinets + counter top (3) kitchens.new tiles (3) bathrooms. no change in lighting.
-
Dec 2006
Reroofing.
-
Jan 2007
None structural. new cabinets, countertop in kitchen new tiles in bathroom lavey & pedestal. new light fixtures gfis. circuit braker update (all flourescent.
-
May 2007
Non structural, new cabinets, counter top sink. 3 bathrooms. new tiles work to be done in apts: 104 105 and 401.
-
Jun 2008
Work @ one unit only. kitchen remodel, bathroom update. countertop cabinets. non-structural.
-
Nov 2013
Renovate kitchen and bathroom, remove kitchen cabinets, update electrical and plumbing as needed. remove tub, toilet, vanity. no strutural walls, install new windows in bathroom in kind not visible from street.
-
Nov 2013
Provide plans for approved 201311051111. interior remodel one unit. remove non load bearing walls to relocate kitchen. provide new office. removel e bath. provide new bath. electrical/plumbing as necessary.
-
Mar 2017
One unit: relocation of existing bedroom door. remodel of existing kitchen & (2) existing bathrooms.
-
Jul 2017
One unit: remodel/relocate existing kitchen. convert dining to new bedroom. remodel existing bathroom.
-
Jan 2018
Like for like fire system replacement w upgrade new panel, smoke heat det, pull stations, same locations. install radio comm and relay modules for new elev recall. will comply with sffc by 2021. connect e bells to new panel.
-
Apr 2023
Upgrade existing fire alarm system to comply with sffc section 1103.7.6.1.
-
Apr 2025
Reroofing no hot works.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline.
Not yet documented: the architect and builder and the early residents. Submit an update