300 Gaven Street
School building
-
1960
Built.
-
July 1, 1976
A Montessori school occupied the property, with a private play area beside the freeway.
-
May 1984
Partitions in open classroom area.
-
Nov 1986
Erect additional school building.
-
May 1989
Construct of new floor, new windows, & doors.
-
Aug 1994
Reroofing.
-
Feb 1999
Erect a two story school.
-
Mar 1999
377 sq ft infill add under existingcovered area/renovate 2500 sq ft.
-
Jan 2000
New fire sprinkler system.
-
Feb 2005
Solar electric system consisting of 164 sharp 175 w pv modules & 5 sma 6000v inverters.
-
May 2010
Interior renovation of an existing pre-school classroom including a new bathroom, lighting, ceiling grid & a new accessible door.
-
Jun 2011
Renovation and access upgrades to an existing 1964 classroom serving a pre-school and kindergarten. improvements include: new ceiling, lighting, accessible doors, restroom access upgrades, and a new classroom kitchen. no structural or mechanical work. no new area added. same student count- no change.
-
Jun 2011
Reroofing.
-
Nov 2011
Demolish existing 1 story, wood framed structure & replace with 2 story horizontal addition plus mezzanine type 5b fully sprinklered. fire sprinkler & alarm under separate permit.
-
Mar 2012
Renovation of existing 2 story classroom building. new exterior wal and interior finishes.
-
May 2012
New fire sprinkler system in (305 sprinklers)new 2-story building per nfpa 13. underground under separate permit.
-
Aug 2012
Installation of a new fire alarm system to replace existing system at the "s.f. school community center". this work will be done in 2 phases as noted on the scope of work in drawing "fa01". (1) facp, (1) ann, 6 relay, 3 smk dct, 18 horn/8 trobes, 15 strobes, 3 (wp0 horn/strobes, 2 batt.
-
May 2018
Voluntary seismic upgrade - sheathing added to existing wall, infill existing opening, add new collector straps. **maher n/a**.
-
Jul 2020
Installation of 2 temporary modular classrooms. installation matches previosly approved installation under app#201203266887.
-
Nov 2020
Minor alteration. modernization and structural upgrades to preschool building. new preschool and kindergarden bathrooms. new door in existing window opening. ** maher: n/a **.
-
Nov 2020
Minor alteration. replacement of existing glazing with accordian door at middle school building. new door & sidelights at middle school admin office entrance. ** maher: n/a **.
-
Jul 2021
Fire only work for the middle school remodels on floor 1; additions are 6 smoke detectors, 1 module, 1 horn/strobe power supply, 14 horn/strobes, and 3 strobes. ref permit application 202011128790 & 202011128771.
-
May 2022
Mechanical upgrades for the existing classroom building (edeli building) at the sq ft school.
-
May 2022
New finishes, casework, and lighting on an existing music room at the sq ft school.
-
Jun 2025
Remove old wood siding and install 4200 sq ft of new james hardie siding on entire building except right side play area wall. street visible.
DBI holds 48 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 48. 1 of them are nominal $1 street-space or sidewalk permits. 1 expired permit is not shown.