953 De Haro Street
Potrero Hill · San Francisco, CA 94107
-
1922
The Potrero Hill Neighborhood House was designed by Julia Morgan and largely completed in 1922; it became the meeting hall of the surrounding Russian community and, during the Second World War, the centre of its Red Cross work.
-
Nov 1981
Additions alterations or repairs.
-
Nov 1985
Install metal hand rail on east side stairs.
-
Jul 1987
New stair & balcony.
-
Aug 1989
Install new walls.
-
Oct 1989
Install 2 walls to roof with insulation.
-
Jan 1992
Rebuild exit stairs in rear/repair doors, replace gutters.
-
Jul 1993
Renew permit application 9200764/revision in scope of work.
-
Oct 1995
Install play structure slab & matting as per plans.
-
Nov 1997
Access. upgrades, sprinkler & life, some interior finishes.
-
Dec 1998
Revision to ramp & elevator shaft drawings frm permit application 9722827.
-
Mar 1999
Upgrade fidre sprinkler system lower plan only.
-
Apr 1999
Renewal of 9722827.
-
Apr 1999
Install fire alarm panel, annusiator, smoke detectors.
-
Aug 1999
Renew permit application 9904103-complete fire sprinkler system.
-
Oct 1999
Renewal of permit inspection permit application 9907935.
-
Jan 2000
Renewal of permit application 9904103, 9915848.
-
Oct 2001
Install 7.2 ku solar system and.4 kw wind (small) generator with battery backmup for emergency ligh.
-
May 2002
Landscape renovation & ada compliant structural deck.barrier removal - ramp installation.
-
Aug 2002
Rev. appl#200205287555 eliminate play structure, replace with planting area, eliminate deck fm work.
-
May 2006
Replace 35 street facing windows sashes with replica. 30 non-street facing exterior and interior window sashes replaced with fiberglass sash & frame. replace 1 steel door & 1 wood french door. replace hardware for 6 doors.paint/patch windows & doors. non street facing replacement windows.
-
Jul 2006
Remove & repair existing damaged sidewalks, remove & replace 7 ficus trees and replace with 6 box trees per order of dept urban forestry order no. 175.502.
-
Mar 2009
Construct new selfcontained, lockable refuse shed, to replace existing new unit to be located on existing off sidewalk slab (on property/grade) on southern heights ave. finish to match material/color of existing main building. h-6'4. l-7', w-5'.
-
Oct 2019
Removal of existing non functional solar panels and replacement of existing asphalt shingle roof at gym. no structural work. total area=2675 sq ft.
-
Aug 2023
To comply with 202305916. removal and replacement of all broken loose or damaged mineral siding tiles, power wash, seal and paint finished wall. (approx. 40'x45' area - north-east part of building).