655 Kansas Street
Potrero Hill · San Francisco, CA 94107
-
1964
Designed by Robert Batchelor on a through-lot parcel on Potrero Hill, its narrow frontage and main entrance on Kansas Street.
-
Aug 1983
Install aluminum windows in existing frames no structural.
-
Jan 1987
Windows to be added to one unit in the north.
-
Jan 1993
Reroofing.
-
Feb 1999
Dry rot repair, replace rim joists& waterproofing, supp.walls.
-
Sep 2013
Installation of concrete shear wall on ground fl.
-
Feb 2014
One unit. remove and replace cabinets, counter tops and fixtures in kitchen, relocate sub-panel for electrical from closet into hallway, replace bath tub, tub/shower valve and all fixtures in bathroom. tile walls and floor in bathroom, replace all lighting fixtures high efficacy. no structural work.
-
Apr 2014
Remodel kitchen & bathroom in one unit only. kitchen approx 10x12 area. bathroom 5x7 area. no changes to doors or windows/work for this unit only.
-
Sep 2014
Replace kitchen cabinet & countertop, retile bath shower & floor.
-
Jul 2015
Reroofing.
-
Mar 2017
Add (4) units under the adu program (2) studios (2) bedroom/ (2) bath units. add windows & doors @ rhode island elevation.
-
Apr 2018
Revision to 201703010446. add storage lockers at ground level and 3rd level, enclose space for lockers and bikes at 3rd level.
-
Aug 2018
Remodel existing kitchen & bathroom. replace in kind. new drywall cabinets, tile & counters. no structural changes. electrical & plumbing under sep permit. one unit.
-
Aug 2018
Remodel existing kitchen & bathroom. replace in kind. new drywall cabinets, tile & counters. no structural changes. electrical & plumbing under sep permit. one unit.
-
Aug 2018
Provide fire sprinkler throughout three units, & 305, per nfpa 13 and new underground fire service per nfpa 24.
-
Oct 2018
Upgrade existing fire alarm system to provide full alarm for new adu's. installation of a new sprinkler monitoring system. install low frequency sounder in all sleeping areas per sffc 1103.7.6.1 ref pa 2017-0301-0446, 2017-1020-1816 and 2018-0817-7629.
-
Oct 2018
Add new adu, one new bath and kitchen at ground floor, per ordinance 162-16 (4 adu's under #201703010446).
-
Oct 2018
Remove @ kitchen cabinets or replace in kind. no structural changes.
-
Jan 2019
One unit: remodel existing kitchen (approx 80 sq ft.) & bathroom (approx 50 sq ft.), replace in-kind, new drywall, cabinets, tile, & counters. no structural changes, electrical & plumbing under seperate permits.
-
Apr 2019
One unit: revision to 201901241149 add 2nd bedroom, complying with bid complaint #201940421.
-
Feb 2020
One unit: remodel 1 existing kitchen & 1 bathroom in kind. remodel & replace drywall as neccessary to upgrade electrical & plumbing as needed. no structural changes. no alteration of wall, window or door.
-
Jun 2020
Add interior wall to create bedroom, replace kitchen appliance and cabinets. replace bathroom fixtures and add 2 skylights.
-
Jun 2021
One unit: remodel existing one kitchen & one bathroom. remove cabinets, tile. remove existing drywall as necessary to install updated electrical & plumbing. install new drywall cabinets & counter. no structural changes.
-
Feb 2022
One unit: remodel 1 existing bathroom and 1 kitchen. remove exisitng finishes to install new electrical, plumbing, drywall, tile, countertops etc. no structural changes.
-
Sep 2022
One unit: replace existing cabinets and new counter tops. add new flooring. add 3 outlets. tile tub and replace existing bath vanity. all like for like.
-
Sep 2022
One unit: replace existing cabinets and new countertops. add new flooring. add 3 outlets. new tiles for tub. swap bathroom vanity "like for like".
DBI holds 49 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 49. 6 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early residents. Submit an update