3200–3220 California Street
Presidio Heights · San Francisco, CA 94118
-
1933
The Jewish Community Center built here in 1933, a privately funded building in the PWA Moderne style. It was demolished in 2000.
-
Jul 1983
Additions alterations or repairs.
-
Jan 1988
Alter & expand kitchen, new equipment, storage area, hvac.
-
Jun 1996
Renovation to existing fitness center at basement.
-
Jul 2001
Erect a type i 3 stories mix use blgd. includes theater, retail, restaurant, gymnasium, office.
-
Oct 2001
Grading/excavation & shoring design.
-
Sep 2002
Installation of complete new fire sprinkler & standpipes systems approx 1700 sp heads.
-
Dec 2003
Structural floor exit in existing tenant space shell no addition to floor area all h.c. work under.
-
Jan 2004
Interior improvements to groundfloor retail space at 1056 square ft. in new building.
-
Feb 2004
New restaurant electrical/plumbing/hood/bar kitchen.
-
Apr 2004
New shaft between 2 floor (bsmt & 1/f), expand existingshaft btwn 1/f & roof, new trash room.
-
Dec 2005
Remodel of existing restaurant. items to remain include most equipment, ceiling, back-of-house, bathrooms, hvac & elecrical system. alterations include minor demolition not affecting envelope, partitions, decorative lighting, relocate 1 door, alter entry doors to lobby in like kind & change finishe.
-
Apr 2006
Revision to app #200107032868 s3 minor relocationof fmaily locker room area, add changing rms, new handicap accessible shower, add sink to handicap restroom.
-
Jul 2006
Installation of bollards @ building entrance, relocation of street light/conduit wire. meeting notes from 08.14.04 re: application critcria & responses found on sheet a0.01.
-
Oct 2007
Addition of new conveniece stair from first floor down through three basements. not a required exit. re-routing ducts and utilities as required.
-
Feb 2008
Revision to application 200710226058 no panic hardware on doors that swing in to stairwell. addition of stair for convenience reason, not required by existing codes. re-routing of ducting & utilities as required, 1st floor down to basements.
-
Jul 2008
Penthouse boiler rm.: add two teco generators, add hot water plumbing & mechanical pipping, add electrical to tie into mains in building. roof top installation @ calcs.
-
Sep 2008
Demolition of existing non-bearing walls. remodel space for new pilates studio use and related mechanical, plumbing & lighting work. re-configure existing restrooms to comply with current accessibility requirements.
-
Jul 2012
Relocate cafe service counter and install new finishes.
-
Aug 2012
Renovation of locker rooms at lower level 1 and addition of office space at ground floor.
-
Jan 2021
Renovation of existing shower and toilet rooms, replace tile, shower partitions, new vanities, mirrors, convert lighting to led. no added wattage, redistribute exhast.
-
Feb 2021
Upgrade hvac system that serves the aquatic center. replace existing air handler unit, add new condenser, new exhaust shaft, new ductwork, replace lighting over the pools. include plumbing, electrical, mechanical, structural & architectural in scope.
-
Jun 2024
Remodel of existing women's steam room. scope includes replacingg the current fixed seating layout and the replacement of the existing ceramic tile, including providing ada access as required for steam rooms.
-
Sep 2025
Replace existing carpet in theater, 1st & 2nd levels. theater work- add acoustic wood wall panels & fabric system. replace surround sound system with new system.
-
Oct 2025
Replace existing retractable seating (409 seats) with new retractable seating (407) seats by same company. new maximum occload of theater only - 423 persons.
-
Jun 2026
Replace two existing 4, 000 mbh gas-fired hot water boilers with four new 1, 999 mbh high-efficiency boilers. replace existing 210 gallon indirect hot water heater with new of same capacity. miscellaneous piping modifications. no increase in gas loads. not decrease in gravity loads.
DBI holds 87 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 87. 6 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the year the building went up, the architect and builder, the early tenants and the date of the last recorded sale. Submit an update