2 Lake Street
Presidio Heights · San Francisco, CA 94118
-
1978
Temple Emanu-El, where a memorial service for Harvey Milk was held in the week after his assassination in November 1978 - the first time an openly gay rabbi officiated there.
-
Feb 1985
Repair exist kitchen facility, install new flooring & base.
-
Aug 1987
Install fire alarm system incl smk detection, new d/openings.
-
Jul 1991
Remove existing wooden ramps & replace with brick and stone.
-
Jan 1994
Install steel door & sidelight at entry lobby.
-
Jan 1994
Response to notice of violation correct action for accessib.
-
Jan 1994
Response to notice of violation docu of unreasonable hardshp.
-
Apr 2002
Street space.
-
Jul 2002
Replace windows, in kind. repaint exterior, repair cast stone ornament, repair bronze ornament, repa.
-
Dec 2002
Replace window, repair wall around opening, add reinforcing steel & strucutral steel.
-
May 2006
Renovation of the existing bimah for expansion and barrier removal efforts, plus general access up-grades to selected facilities.
-
Feb 2008
Relocation and consolidation of archive and artwork storage from balcony level to basement. partition 2 rabbi offices. upgrade stairs from ground floor to basement. remove bathroom toilet fixtures and partitions from basement level. no lighting changes.
-
Apr 2011
Ground floor-furnish & install 1 ansul r102 fire suppression system in the main kitchen area.
-
Jun 2013
Add interior partitions, electrical outlets and associated finishes to existing four level offices. no change in occupant load. path of travel to remain unchanged. field verify sprinkler and fire alarm coverage.
-
Apr 2014
Voluntary fire alarm coverage upgrade, no new construction, all devices shall be added to an existing fa system. this includes 55 speaker strobes, 1 strobe, 9 smoke detectors and 2 bps.
-
Dec 2015
Install steel channels and expansion anchors to existing concrete walls. install steel braces between steel channels. voluntary seismic strengthening.
-
Jul 2016
Roof repairs 2 sections of tile. no work visable from street.
-
Feb 2022
Interior renovation of the temple house & new addition to main sanctuary within existing historic exterior walls of courtyard wing. renovation includes: new mechanical systems, seismic strengthening, new stairs & elevators, excavation for additional program spaces, & a new occupiable roof deck.
-
Mar 2023
Temporary shoring & tiebacks associated with renovations to temple emanu-703.
-
May 2023
Soft demolition of temple house & court yard wings including removal/saluage of historic elements & materials for reuse.
-
Sep 2023
Fire only permit for new 6" underground fire service.
-
Oct 2023
Erect tower crane for temporary use. potain mdt 109. jib length 98ft. tower ht 127.9ft. ref site permit application 202202097657.
-
Oct 2024
Ref permit application 2022-0209-7657 furnish & install (1) ansul r-102 fire supression system in main kitchen area.
-
Feb 2025
Installation of exterior building lighting at the temple house facade on lake st & the sanctuary facade facing the interior courtyard.
-
Jul 2025
Restoration of the e) lake st exteior arch.
DBI holds 39 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 39. 3 of them are nominal $1 street-space or sidewalk permits.