145 Laurel Street
Presidio Heights · San Francisco, CA 94118
-
1920
Originally the Hillard, designed by Alfred Henry Jacobs at the corner of Washington and Laurel streets. A $350,000 Class A building announced in 1919 and featured in the Architect and Engineer that September; a whole floor was given over to staff rooms reachable by telephone and a service elevator. A metal and glass marquee shelters the entrance.
-
Apr 1982
Otc alterations permit.
-
Aug 1984
Removel 4 apartment units including kitchens bathrooms minor.
-
Aug 1985
Re-instate expired permit #847282 no change in original.
-
Apr 1986
Remodel one unit add new bathrooms.
-
Nov 1993
Parapet strengthening.
-
Aug 1999
Remodel int to include kitchen and three bathrms.
-
Mar 2000
Kitchen and bathroom remodeling.
-
Jan 2001
Remodel 3 baths & one kitchen, no new added walls or doors (replacement ok).
-
Sep 2005
Reroofing.
-
Nov 2005
Remodel kitchen, new cabinets, countertops, appliances/refinish floors and paint.
-
Apr 2007
Remodel 1 kitchen, new cabinets, flooring change light fixtuares refinish floors, paint and repair plaster.
-
Nov 2014
Voluntary seismic strengthen of steel frame structure with masonry & concrete walls. correction include strengthening vertical discontinuity & adding concrete shearwalls at the lower levels.
-
Aug 2015
Kitchen and bathroom remodel at one unit. no windows, no structural. fixtures at same locations.
-
Jul 2016
Phase ii shear core voluntary seismic strengthening and revisions for as built conditions for 201411191978 phase 1.
-
Apr 2018
Construction of new studio adu unit per ord# 162-16.
-
Apr 2019
Installation of a 4 sector att rooftop cellsite and all equipment. 16 antennas, 20 rrh's, 4 dc surge protectors, 1 gps antenna.
-
Nov 2019
Phase iii: voluntary masonry veneer repairing.
-
Nov 2020
Repair cracks, exterior wall (south elevation). repair window where needed in kind and paint on the south elevation.
-
Apr 2021
Upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 and unclude srinkler monitoring and elevator recall. ref permit application 2017-0317-1793 ref sprinkler # 2017-1005-0465.
-
Jun 2021
Phase iii (part 2): voluntary masonry veneer/curtain wall repairing, strengthening, and related facade. water proofing repair to amend permit application 202011068372. ref. permit application 201911258135.
-
Sep 2021
Reroofing. overlay existing built-up roofing. install dens-dck + 2-ply modified bitumen siplast roofing over existing cap sheet foor membrane, install new copper flashing over top of parapet wall.
-
Jul 2022
Phase 5 - new washer/electrical dryer for individual units.
-
Oct 2022
Phase v: apartment remodel. (4) kithen (2) bathrooms + misc.
-
Mar 2023
Replace existing bathrooms in kind on 6th floor. (1) bathroom in one unit, (2) bathrooms each in two units.
-
Dec 2023
One unit: remodel and phase iii completion of phase 1 of volutary seismic strengthening work within one unit.
DBI holds 62 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 62. 17 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early residents and the date of the last recorded sale. Submit an update