2728–2748 Hyde Street
Russian Hill · San Francisco, CA 94109
-
1956
Built.
-
June 18, 1964
Photographed, showing the American Forest Products Corporation.
-
Jun 1984
Interior renovation -exterior finish work.
-
Apr 1988
Horizontal addition.
-
May 1988
Conversion of street level commercial space to retail.
-
Feb 1989
Install interior fire sprklr system & wet standpipe.
-
Apr 1989
Hvac work as shown on plan.
-
Feb 1990
Partition and realignment for comm'l tenant improvement.
-
Aug 1996
T/i per plan on 3/f separate permit for mechanical & electri.
-
Nov 1996
Relocate duct work, sprinkler, replace light fixture.
-
Jan 1997
Revise appln #9614491 for fire alarm.
-
Dec 1998
Oti-1 2nd floor el, sp.
-
Apr 1999
Fire alarm system.
-
Jul 2001
One-stop: water damage in stair new sheetrock's fix stair.
-
Sep 2003
3/f- t.i., mep under seperate permit, no structural work.
-
Jun 2004
New mechanical work and electrical work on 2nd & 3rd floors.
-
May 2007
T.i on single floor, single tenant. no exterior work, upgrade sanitary facilities, create offices + classrooms. sprinklers under separate permit. mechanical under separate permit.
-
Jul 2007
Defered title 24 submittal for tenant improvement. this is a revision to permit # 2007/05/29/2415. lighting only.
-
Jul 2007
Mechanical ducting only. no equipment. hvac supply, rentry, fresh air on 2nd floor. this is a revision to permit # 2007/05/29/2415.
-
Aug 2007
Install a secondary convenience stair between ground and 2/f. this stair is not the main means of egress, as there are 2 other main stairs serving the building. no exterior work.
-
Sep 2008
Tenant improvement of existing 2nd floor office space, new non-bearing partitions and upgrade of disables access restrooms.
-
Mar 2009
Interior remodel of ground floor looby of existing office building. no exterior work.
-
Aug 2012
Install a secondary convienient stairs between 1st & 2nd floors. this stair is not the main means of egress, as there are 2 other main stairs serving the building. no exterior work.
-
Aug 2012
2nd fl-t.i work includes demolition of non load bearing walls, new interior glazing in existing walls, new ceiling tiles, 4 new motion controled faucets, wall hung sinks at men's restroom, sound proof at existing restrooms. painting & install carpet. t.i does not involve a change of occupancy/use.
-
Aug 2012
1st fl-t.i work includes demolition of non load bearing walls, new interior glazing in existing walls, new ceiling tiles, 4 new motion controled faucets, wall hung sinks at men's restroom, sound proof at existing restrooms. new millwork exteriosion to match existing. t.i does not involve a change of occupancy/use.
-
Aug 2017
Add 1 mop sink and 3 food prep sinks in cafeterioa. finishes: minor cosmetic improvements of drywall, patching, paint, fpr panels, rubber base.
DBI holds 64 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 64.
Nearby
- 2626 Hyde Street Same street
- 2761–2765 Hyde Street Same street
- 680 Beach Street Around the corner
- 715–721 Beach Street Around the corner
- 725–737 Beach Street Around the corner