500–502 Jefferson Street
Russian Hill · San Francisco, CA 94109
-
1938
The South End Rowing Club's clubhouse was moved to the east side of Aquatic Park during construction of the Maritime Museum. Founded in 1873, the club had already been moved once — by barge, from the foot of Third Street at Mission Bay to the foot of Van Ness Avenue — and had to fight off industrial interests to keep its waterfront access.
-
Feb 1992
Repir & replace fence at west prop line chain link 6' high.
-
May 1993
Reroofing.
-
Dec 1994
Install new shower room & sauna in existing lightwell.
-
Mar 1996
Handicap entry ramp, remodel women's locker room, bath area.
-
Jun 1997
Remodel existing lockers, showers, sauna and restroom.
-
Dec 1998
Expansion of existing second floor sauna.
-
Jan 2001
Remodel existing restroom to comply with accessibility requirements-barrier removal only.
-
Apr 2001
Remove existing single story cookshack & rebuild as 2 story with new dayrm, add new fire exit from 2/fl.
-
Sep 2001
Rev. to current permit under permit application 2001/01/26/0690: for structural repair of field-discovered dry rot.
-
May 2003
Remove existing single story cookshack + rebuild as two story with new dryroom. add new ext. fire exit.
-
Nov 2007
Replace existing shower valves & repair existing shower pan in existing men's shower room; remove existing floor tile & wall tile as needed. install new valves, install new shower pan, replace tile to match existing.
-
Mar 2008
Repair of pilings and deck structure of existing pier, by encasing pilings with jackets and epoxy and replacement of existing cross beams.
-
May 2008
Replacement of ceramic wall & floor tiles and plumbing fixtures in existing men's shower room on 2nd floor.
-
Apr 2010
Remove and replace 300 lockers on 2nd. floor ada womens locker rm.
-
Jan 2012
Demolition existing 1 story boathouse. add new boathouse at same footprint with new women's locker room and exercise room above. existing building elements to be upgraded to 1 hour type va construction.
-
Apr 2012
Repair 2nd floor deck and upgrade existing foundation and strengthening the deck for dry rot rotted timber.
-
Nov 2013
Reroofing.
-
Oct 2016
Ada guard at c1 water fountain. ada door actuator to gym, lightweight build up on e ramp, step at e patio, new openings (interior), new climate seal door ramp. n/a for maher.
-
Oct 2016
Remodel 2 existing baths, 1 fully accessible and 1 useable(meets 2010 code), and install mop sink. n/a for maher.
-
Jul 2019
Repair and reinforce e boat launch apron structural components. maintenance and repair of e bcdc required improvements. all work will be in kind except as noted. ex heights and areas will remain the same.
-
Oct 2022
Exterior alteration & additions & interior remodel to an existing 2-story wood frame building. 1st fl: demolition & replace existing 1-story kitchen & weight rm approx 887 sq. 2nd fl: new roof deck atop weight rm approx 605 sq ft, extend existing egress stair. roof: remove/replace access stair & walkway to existing cupola.
-
May 2023
Reroofing.
-
May 2024
Install new exterior sauna room at existing deck (at grade).
-
Sep 2025
Modify sprinkler head locations to accommodate new elevator shaft, decks and partition layout. new was 22 total heads 27 ref permit application 202210114038.
-
Feb 2026
Deferred mechanical, electrical and plumbing for permit application 2022-1011-4038.
DBI holds 53 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 53.