941–953 Lombard Street
Russian Hill · San Francisco, CA 94133
-
Aug 1983
To bring building into full compliance with te provisions.
-
Dec 1984
To bring building into full compliance with the provisions.
-
May 1991
Remodel kitchen & bath, new cabinets, plumbing, fixtures.
-
May 1991
Add new skylight, dining room, double joist, closet & door.
-
Jul 1991
Remodel bath & kitchen, cabients, sheetrock, dry rot.
-
Jul 1991
Install doors to deck at window openings, & new tile.
-
Oct 1991
Kitchen and bathroom remodeling.
-
Oct 1991
Install skylight in one unit.
-
May 1993
Kitchen & bath remodel.
-
1994
The 1994 season of a nationally broadcast reality television series was filmed in this house, bringing the experience of a young man living with AIDS to a mass audience.
-
Jan 1994
Remodel kitchen, electrical update, create set for "mtv".
-
Feb 1994
Reroofing.
-
Aug 1994
Reroofing.
-
Feb 1995
Raise floor over existing conc slab at rear, add 1/2 bath.
-
Nov 1995
Revision to 9501538, add fire rated walls to social &bath rm.
-
Dec 2000
Add 2 bays stacked over each other 3rd /4th story eastside modify 3 windows closing another window wes.
-
Dec 2000
Addition of 2 bays stacked over each other at 3rd and 4th story of eastside modify 3 windws closing.
-
Jan 2001
Seismic upgrade to provisions in spec section 3403.6 104f and structral repair due to fire damage.
-
Dec 2001
New garage/work room addition @bsmt with roof deck above, enclosure as habitable space ofexistingrecess roof.
-
Apr 2002
Rene: permit so it can be signed off when seismic upgrade and structural repair (ref: 200101028957).
-
Apr 2002
To renew app#2000/12/22/8611 for final inspection.
-
Jul 2002
Install fire sprinkler system per nfpa-13 throught out.
-
Jul 2003
Installation of laundry room per attached plans on ground floor.
-
Sep 2003
Standard curb cut - 10' (reference 2001/12/05/4561).
-
Oct 2014
Add bathroom at 2nd fl.
-
Nov 2014
Replace bathtub with new one, re-tile existing bathroom 2nd floor.
DBI holds 40 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 40. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update