2355 Polk Street
Russian Hill · San Francisco, CA 94109
-
September 26, 1972
The Office of the Assessor-Recorder photographed the property for tax assessment.
-
May 1990
Parapet bracing.
-
Aug 1995
Reroofing.
-
Oct 1996
Shoring only under appl #9214626 geotechnical report.
-
Mar 2003
Reroofing.
-
Mar 2003
Patch plaster throughout unit as needed.kitchen upgrades.reinstall existing closet walls. prepare.
-
Nov 2004
Repair cracks at interior colums 2 in garage.
-
Jul 2007
Remove old, damage, loosey falling ceranice tile, remove all tile & morthr bed from front & side of building 5' heigh on polk & union st, prepare surface for new 6x6 ceramictile & install new tile same as existing.
-
Mar 2018
One unit: kitchen and bathroom remodel. patch plaster throughout unit as needed. no alteration for any wall. no structural work. maher n/a.
-
Mar 2018
One unit: kitchen remodel, replace cabinets, countertop, tiles, linoleum floor, appliances; bathroom, replace tiles, vanity, toilet, install gfi.
-
Feb 2020
Renovation of 5 apartments: one unit on 1st level, one unit on 3rd level, one unit on forth level, two units o sixth level. new bedrooms & bathrooms. new kitchen cabinets and plmg fixtures. nw washer & dryers & dishwashers. new lighting at existing j-box locations. no change to mechanical.
-
Oct 2020
One unit: new media room and den, new kitchen caibnets and plumbing fixtures. new washer/dryer & d/w. new lighting at existing j-box locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work. no structural work.
-
Apr 2021
Adding (5) units on basement level per ordinance 162-16. convert existing basement into new dwelling units within existing envelope. new bedrooms, new bathrooms, new studio, new dishwashers, new washer/dryers. new windows facing the street.
-
May 2021
One unit: renovation. new bedrooms. new kitchen cabinets and plumbing fixtures. new washer/dryer & dishwasher. new lighting at existing j-box locations. no change to mechanical. no exterior work. no fire alarm/sprinkler work. no structural elements affected.
-
Jun 2021
Two units: new bedrooms, kitchen cabinets, and plumbing fixtures. new washer/dryer & dishwasher. new lighting at existing j-box locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work. no structural work.
-
Aug 2022
One unit: renovation on 6th floor including new bedroom, new kitchen cabinets, plumbing fixtures. new washer and dryer & dishwasher. new lighting at existing j-box locations. no change to mecnanical, no exterior work, no fire alarm or sprinkler work, no strct elements affected.
-
Nov 2023
Upgrade fire alarm system to current codes, nfpa 72 (2022), to comply with sffc sec. 1103.7.6.1 to provide low frequency sounders in sleeping areas.
-
Jun 2025
Upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 to meet 75db in all sleep areas.
6 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early residents. Submit an update