1515 Vallejo Street
Russian Hill · San Francisco, CA 94109
-
1970
The later offices of the law practice Brown, Dearman & Smith.
-
Apr 1992
Repair damaged stucco facade on side of entry way.
-
Aug 1998
Fire repair replace drywall in one unit check electrical add smok.
-
Nov 2001
Remodel 10%, or 21 units to fully accessible, provide accessible parking and path of travel.
-
Dec 2001
Reroofing.
-
Feb 2002
Soft demolition corridor t-bar ceiling, not fire rated ceiling work (20011116355).
-
Jul 2002
Install a fire sprinkler system & upgrade the d.s.p. sprinkler heads.
-
Sep 2002
Install fire alarm system.
-
Apr 2003
Revise permit application 200209166515. change horns to strobe/horns in every unit. add five smoke damper control to.
-
Oct 2013
Construction of solar thermal collector rack. rack is composel of cold rolled galvanized steel joist( rack is level). manufacture's rack on top of rack will provide tilt for collectors. rack will be elevated with no point lower than 6'5" to provide access under collectors. work to be performed.
-
Sep 2018
Demolition only existing partition walls at e mercantile space. no structural demolition. no exterior demolition. e sprinkler and fire alarm system to remain. remain vacancy under ab-017.
-
Mar 2019
Addition of bedroom & bath to the existing 1 bedroom property manager's apartment located on the 4th floor of the building. the addition will be over a lower roof area with a high parapet wall.
-
Jan 2020
Change of use to office. accessory office t.i. demolition bathrooms provide new walls, doors, windows, bathrooms and ada entrance.
-
Feb 2021
Add on to existing fire system due to tenant improvement in office area on ground floor in fully sprinklered building. install new power supply panel, smoke det. above and notification devices thru-out new devices will be tie-in to existing. panel on 1st fl. # 2020-0130-3133.
-
Feb 2021
Add and relocate and remove fire sprinklers per tenant improvements (9 add) (46 relocate) (4 removed).
-
May 2022
100% affordable housing. main building: install new concrete foundation at new steel columns at rear of building. provide new concrete walkway and flat work at west courtyard. provide new handrail at existing ramp. provide steel brackets at each of the two existing bridges that connect the north wing to the main building.
-
Jun 2022
Replace existing kitchen and counter top in 21 acessible units to meet hud requirements. interior only.
-
Nov 2022
North wing: provide ten steel diaphragm strengthening frames at existingskylight opening above g/f. all work to occur on interior side of skylight above vacant commercial space & boiler room. provide steel brackets at each of the two existing bridges that connect the north wing to the main building.
-
Oct 2023
Remove windows storefronts at e openings as noted on plans and replace in-kind. repair e windows as noted. 29 replacements, 1 repair.
-
Oct 2023
Remove windows storefronts at e openings as noted on plans and replace in-kind. repair e windows as noted. 7 repairs.
-
May 2024
Interior office renovation includes removal of existing finishes; selected non-structural walls, electrical and plumbing; renovation to provide new floor; wall and ceiling finishes; new non-structural partitions and lighting fixtures. renovation include restroom and pantry no exterior work.
-
Mar 2025
Install pre-fabricated stair for pg&e access. fix one leaf door in closed position.
-
Mar 2025
Main building - reference permit #202205174400. scope modified to install concrete beams under new proposed support columns. also include 2 exterior ramps and handrails along with deck between columns. work is only at main building.
-
Apr 2025
Reroofing, no hot works.
-
May 2025
Add 1 remote power supply and additional low frequency horns to existing fire alarm system, in all non ada units with existing horn strobes, replace horn strobes with low frequency sounders to comply with sffc section 1103.7.6.1 add led remote annuciator.
-
Jun 2026
Revision of 202606052652 and 202606052653 to include upgrade of sounders to comply with 1103.7.
DBI holds 42 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 42. 5 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update