1900 Van Ness Avenue
Russian Hill · San Francisco, CA 94109
-
1919
Recorded in the city's survey of the Van Ness Avenue automobile corridor as built for use as an auto showroom.
-
Oct 1985
Awnings to be installed over five existing windows.
-
Apr 1993
Install new alum and glass entry.
-
Aug 1994
Partial removal of the mezzanine floor, new storefronts.
-
Sep 1994
Tenant improvement.
-
Feb 2000
Abate n.o.v. #9901029 reduce and reinstall billboard sign.
-
Jul 2000
Remove sign.
-
Feb 2003
Umb ordinance seismic upgrade-concrete, rebar, structural steel & wood framing.
-
Dec 2004
Fire alarm system with 4 smoke detectors, 1 horn/strobe, 1 pull station. system for elevator recall.
-
Sep 2005
Sign permit - wall, single faced, non- electric.
-
Dec 2005
To erect electric wall sign.
-
Jun 2007
New accessible bathrooms at second floor remodel of two existing new aprtition walls for existing offices on second floor no exterior work.
-
2010
Evaluated in the city's survey of the Van Ness Avenue automobile corridor and given California Register status code 6Z — not individually eligible for the California Register.
-
Oct 2012
To erect electric sign.
-
Apr 2013
Change copy to 2 existing single faced wall signs.
-
Feb 2016
Interior office ti new office layout. bath renovations, upgrades, lighting, power upgrades, mechanical reducting.
-
Jul 2016
Reroofing.
-
Aug 2016
3rd floor only: interior office ti, bathroom upgrades, lighting/power upgrade, mechanical re-ducting, ada compliant entry; maher n/a.
-
Sep 2016
Copy change to existing signs - single faced.
-
Aug 2017
Tenant improvement on ground @ 4, 100 sq ft yoga studio. change of use from retail to fitness. assembly space, fire alarm under separate permits.
-
Aug 2017
Install two illuminated single-faced wall sign. maher na.
-
Nov 2017
2nd floor: add 3 office and conference room, new electrical, renovate restrooms & pantry. maher na.
-
Oct 2018
3/f: relocation of smoke detector, documentation of existing local fire alarm system maher not req, ref permit application 201608094576.
-
Jul 2019
To comply with nov 201921852 (dbi) remove three roll-up doors installed withuot permit.
-
Jun 2020
Base building improvement of existing exist and exist corridor. scope of work - remove portion of existing storage storefront, and construct new exit and exit vestibule. maher na.
-
Sep 2022
Install security gate.
DBI holds 47 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 47. 5 of them are nominal $1 street-space or sidewalk permits.