679 24th Avenue
Industrial building · Seacliff
-
1915
Built.
-
1915
The electric substation here was finished to a third of its planned length — 48 of an eventual 72 by 110 feet — with room for six motor-generator sets.
-
May 17, 2001
The City Planning Commission approved as amended conditional-use authorization to install three antennas and a base transceiver station on the existing substation building, with a false parapet to block the antennas from view, 6-0.
-
May 17, 2001
An existing Pacific Gas & Electric substation building stood on the site.
-
Sep 2001
Reroofing.
-
Oct 2001
One-stop: install antenna & equipment for pcs. new penthouse.
-
May 2003
Renew expired permit for final inspection 200104025857, 200107113439, 200204265085, & 200208053145.
-
Apr 2013
Modifications to an existing sprint cell site.
-
Feb 2015
Modification to existing sprint wireless facility. remove & replace 3 cabinets with 2 cabinets, 3 antennas with 3 antennas & assoc equipment including rru's, cables, relocate gps, faux vent pipe (no cap), pg + e shutdown.
-
Apr 2015
To obtain final inspection for work approved under permit application 200110191260 all work is complete.
-
Feb 2017
Design, remove and replace the existing smoke detection system with new system. remove and replace all notification and initiation devices with new devices. wiring, conduit, and locations do not change. to tie to central monitoring service.
-
Feb 2017
Stret space.
-
Apr 2017
Remove sprinkler system for transformer being removed. install new wet pipe system for regulators installed.
-
Feb 2019
Replace (3) existing antennas witn (3) new triband antennas, (1) per sector, relocate (3) existing 1900 rru's to near antennas (1) per sector, replace (3)existing 800 rru's with (3) new 2 port rru's (1) per sector, install (3) new 2.5 rru's (1) per sector, install (10) froming to support new antennas and new.
-
Dec 2022
Tmobile & sprint mercing wireless services at this cell sites. t-mobile to remove decommission components of wireless sites. no removal of monopoles/towers or any structural components. structure will remain in use. site will be restored to pre condition.
-
Nov 2023
(tmobile) removal of sprint wireless equipment cabinets and antennas.
-
Mar 2026
Reroofing no hot works, overlay of existing bur roof with new tpo membrane adhered to existing.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline. 6 expired or cancelled permits are not shown.
Nearby
- 667 24th Avenue Same street
- 716–718 24th Avenue Same street
- 2338–2340 Balboa Street Same block
- 676 25th Avenue Same block
- 660 25th Avenue Same block
- 656–658 25th Avenue Same block
- 700 25th Avenue Around the corner
- 669 25th Avenue Around the corner