274 Brannan Street
Industrial building
-
1923
Built.
-
Apr 1982
Building use: office/comml.
-
Apr 1983
General remodeling of existing 2nd floor space.
-
Feb 1984
Install seismic bracing in existing concrete building.
-
Dec 1984
Hvac system for 4th, 5th, 6th & portion of 3rd floor.
-
Jan 1985
Remodel 6th floor, install steel studs and drywall in 3rd fl.
-
Sep 1989
Add raised floor area for communications equip with access.
-
Nov 1991
Installation of new 1500 kw emergency standby generator(epc).
-
Aug 1995
Roof mounted equipment.
-
Jul 1996
Cti-1 4thfl, el, me, sp.
-
Sep 2013
Replace (3) b.a.c. fluid coolers due to age and degradation. disconnect & reconnect existing piping connections. install seismic isolation (replace) for each fluid cooler on existing column steel platform supports.
-
May 2014
Rooftop insl verizon wireless equipment layout mounted on an existingsteel platform. reloc&reduceexistingmicrowave dishes.alpha sector to be relocated: swapexistinglte withnewantenna.add(2)new antennas& assign to alpha b2b.beta: no chg.gamma: no antenna chg, raiseexistingrad ctr by 4'.add2 new antenna &assign to gamma b2b.
-
May 2014
5th fl: remove all interior sheetrock walls, electrical, hvac floor coverings and return space to a blank interior for future ti. per ab-017.
-
Jul 2015
Suite 601 - new full height partitions, new partial height partitions, doors, frames, glazing, millwork, finishes etc. meps, life safety changes, if need, will be design build & sumbitted separated. n/a maher ordinance.
-
Aug 2015
6th floor: mechanical work for permit application 201507131343. n/a ordinance #155-13.
-
Jun 2016
Install (2) new crac units on 3rd floor to serve an existing server room. install (2) new condensing units on roof.
-
Jul 2016
Install 2 new computer ac units on 3rd fl and 2 condensing/coolers at roof to serve e server room. maher not req.
-
Oct 2016
Partial ti including removal and addition of non load bearing partitions, ceilings, finishes. accessibility upgrades, fire sprinkler and alarms under separate permit.
-
Jun 2017
5th fl - demolition of selected existing full height partitions; construction of new full height partitions. project includes reconstructed restrooms/upgrades. meps and life safety fire protection systems under separate permit. (building is fully sprinklered) n/a for maher.
-
Aug 2017
5th floor, ste 500 - mechanical and electrical for 2017-0616-9558 and revised arc permit #2017-08-17-5072.
-
May 2018
Reroofing.
-
Oct 2018
5th fl: t.i. demolition of selective existing partitions ceilings, lighting, new full height partitions doors etc. mep, life sagety & sprinklers submitted under separate permit (building fully sprinklered).
-
Jan 2019
Mep for tenat improvement.
-
Dec 2019
6th fl: demolition of selective existing full-height partitions, ceiling elements & lighting. construction of new non-structural partitions, doors, glazing. mep & fire life safety under separate permit. maher na.
-
Jan 2020
6th fl, ste 601 - mechanical & electrical for ref pa 2019-1217-9704.
DBI holds 302 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 302. 3 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 230–250 Brannan Street Same street
- 275 Brannan Street Same street
- 577–599 2nd Street Same block
- 563 2nd Street Same block
- 555–559 2nd Street Same block
- 543–545 2nd Street Same block
- 601–615 2nd Street Around the corner
- 625–635 2nd Street Around the corner