1972
Built.
-
1973
The Hyatt Regency and its atrium, designed by architect John Portman.
-
Sep 1981
Additions alterations or repairs.
-
Oct 1981
Additions alterations or repairs.
-
Sep 1984
Demolish existing concealed spline ceiling & install hvac.
-
Apr 1985
Remodel & expansion of existing exhibition/meeting rooms.
-
May 1986
Remodel the street level of hotel.entry drive.
-
Jun 1987
Replace hotels fire alarm system with new.
-
Jun 1988
Tenant improvement, no change in occupancy or load.
-
Nov 1992
Renovate public areas-arch, struct, mechanical, electrical, plmg, sprk.
-
Jun 2001
Change ap#200101069341 fr 4 embarcadero ctr to 5 embarcadero ctr remov/repla existingsteel/glass storefr.
-
Oct 2002
Demolition of existing finishes, installation of new finishes with minor elel, mechanical, plumging & fire alarm.
-
Aug 2005
New addressable fire alarm system on all floors.
-
Aug 2007
Tenant improv. to guest rms. on 16/f & 17/f & suite rms. on 2/f to 15/f (type s1, s2 & s3) fixture, furniture & finishes upgrades throughout.new floor @ entry vestibule. new toilet, new faucets @ lav. & tub (alternate condition: remove existing tub & install new shower or new tub as per pln. total 135 rm.
-
Dec 2007
Revision to permit application 2007-0830-1440 for reduced scope of work. changes include removing all alternative bathroom conditions & maintaining a portion of the existing lighting in all rooms, add new plumbing drawings to show new shower vs. existing tub configurations.
-
Dec 2007
Ev. to p/a #2007.08.24.0840. incr. scope of work: front entrance area of club lounge to include beverage counter & reach in referigerator, incr. buffet counter length and increase space betwem existing backwall & allow low panels for banquett seating & install new furring walls. (changes as delta 8).
-
Sep 2009
Relocation of fitness center from bay level to atrium level, refinish space being vacated. work includes minor demolition, new millwork, finishes & equipment. mep, life safety & sprinklers under separate permit.
-
Dec 2014
Remodel of hotel, bar, flex space, platform with new reception & concierge desk & @ the 3rd floor level/ new occupant loads-mep, removal & replace selected floor finishes, new wall finishes gyp board ceiling, new doors, operable walls & lighting. sprinklers & fire alarm sep. permit.
-
Apr 2015
New accessible loading & walkway & detectable warnings, new automatic revolving door with new swinging doors to replace existing entry, limited regrading & nw curb cuts, nw railing & gates at existing exit stairs from bsmnt. nw landscaping(potted plants), nw decorative lghtg. new signage on seperate permit.
-
Jun 2015
Verizon wireless unmanned telecommunications facility consisting of 5 total antennas behind frp and related radio equiment. n/a for maher.
-
Nov 2016
Bathroom shower conversion in 78 rooms, selective wall & floor relocation, selective electrical relocation, convert 1 balcony suite to accessible suite. n/a ordinance #155-13.
-
Dec 2017
Modification to 225 guestroom guardrails majer na.
-
Dec 2018
Renovation of guestroom levels, scope of work includes new entry door, new ceiling, new toilet, shower, tub and vanity, new finish and new furnishings.
-
Jul 2021
Renovation of e guestrooms ( floors 12, 14, 15) to provide clear floor space at plumbing fixtures. scope also includes outlet relocation and new ffe, finishes, lighting, plumbing fixtures. renovation of corridors on floors 12-17, including new finishes ffe and lighting. existing hvac systems to remain.
-
Sep 2021
Floors 2-11: renovate existing guestrooms to provide clear floor space at plmbing fixtures scope.inlcludes outlet relocation and new ff&e, finishes, lhgting and plumbing fixtures.renoation of corridors on floors 2-11, including new finishes and pf%e. existing hvac system to remain.
-
Dec 2021
2nd-11th floor: fire sprinkler permit. relocate 666 and add 312 sprinklers for guest room remodel and floors 2-11. 978 heads total. ref pa 2021-0915-8502.
-
May 2022
Addition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes new entry door, walls, lighting and finishes. replace existingwindows.
DBI holds 277 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 277. 10 of them are nominal $1 street-space or sidewalk permits. The assessor's roll gives 1972; this address is recorded as built 1973.