360–370 Third Street
South Of Market · San Francisco, CA 94107
Permit history
-
Sep 1985
Installation of "cheney" wheelchair.
-
Sep 1986
Demolish & remodel interior of floors 2 thru 7.
-
Feb 2007
Full demolition of 7 floors, elevator corridor/included to create shell space sprinkler an life safty work to remain.
-
Aug 2007
Upgrade all restrooms and ground floor elevator lobby. fire alarm and sprinkler under seperate permit.
-
Sep 2007
New exterior stair with new pedestrian entry. remodel stairs and building entry with new canopy. new window wall system above entry. new parking area on partial ground floor. new exterior guardrails & glazing at balconies.
-
Oct 2007
New exterior stair with new pedestrian entry. remodel stairs and building entry. new window wall system above entry new parking area on partial ground floor. new exterior guardrails and glazing at balconies.
-
Jan 2008
Supply complete building with fire sprinkler system. add new pump and system. total add 2443 fire sprinklers heads.
-
Aug 2008
Interior ti of floors 1 and 2 comcast: new partitions for private offices, conference rooms, break room and studio. structural work inlcuded. mep, life safety, and fire sprinkler under separate permit.
-
Mar 2012
Tenant improvement to partial 2nd and 3rd fl of seven story building. includes new partitons, raised floor, convenience stair and 2 story high studio space. mechanical and electrical, plumbing, an fire protection under separate permit. no change of use or occupancy.
-
Mar 2012
2nd/3rd floor t.i., new duct distribution with heating water piping. rooftop air cooled chillers/pumps/cooling tower for 24/7 cooling. req with floor mounted ahus. chilled water piping to ahu's, qty 2 exh fans, qty 1 makeup air unit. mechanical scope only. struc under sep. permit. ref #201203055349.
-
May 2012
Tenant improvement - ref to permit application 201203055349. energy title 24 - tenant improvement for 2nd & 3rd floor. separate permit for title 24.
-
Aug 2012
Roof & ground floor. add bike storage on ground floor. add new deck, elevator access & restrooms. roof landscape etc.
-
Dec 2012
Tenant improvement on the 6th floor to create open office, conference rooms and break area. mep, fire sprinkler, life safety under seperate permit.
-
Jan 2013
6th floor-t.i-new medium pressure loop, installation of new low air distribution, 5 new fire/smoke dampers, new water source heat pumps, new hot water supply & condensor. ti permit application 2012-1205-5512.
-
Jan 2013
4th floor-ti includes demolition of non structural partitions & building new non-structural partitions. all new or revised hvac, electrical, plumbing, life safety work will be design build & submitted for permit seperately. building fully sprinklered.
-
Jan 2013
4th floor: meps for arch. per app#201301097554.
-
May 2013
5th floor-full floor tenant improvement-selective demolition, add new non load bearing partitions, doors & finishes with full m.e.p. life safety & sprinklers on seperate permit.
-
Jun 2013
Selective (ti) demolition of partitons, ceilings, and finishes. new partitions, restrooms' upgrades. mep and life safety under separate permit.
-
Dec 2013
Construction of non-structural partitions, doors, frames hardware, millwork, drywall and acoustical ceiling, grid/tile and finishes. mechanical, electrical, plumbing, fire sprinkler and life safety is a deferred submittal.
-
Dec 2013
6th floor suite 615. tenant interior improvement with mechanical, electrical & plumbing. sprinklers & fire alarm submitted under separate permit. compliance with ordinance #155-13 not required.
-
Feb 2014
3rd floor t.i. to demolition partitions, doors, & millwork & construct new partitoins, doors, finishes & millwork. mep, life safety & fire sprinklers on separate permit. compliance with ordinance #155-13 not required.
-
Apr 2014
T.i. on partial 4th floor tenant space to demolition doors and parttions and construct new doors, non -structural partitions, millwork, finishes, mechanical and electrical. fire sprinklers and life safty on seperate permit. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13.
-
Jan 2019
7th fl - ti of office to include non structural improvement of office area, break room (no food service), mep improvement. sprinkler, & fire safety under separate permit. no exterior work.
-
Oct 2020
5th floor. t.i to existing equipment rooms limited to minor architectural, hvac and t.i alterations.
-
Dec 2022
Suite #103: demolish existing non-structural partitions, doors + frames, ceiling, lighting, millwork and finishes throughout. new construction of non-structural partitions, doors + frames with sidelite, ceiling, lighting, millwork and finishes.
DBI holds 321 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 321. 10 of them are nominal $1 street-space or sidewalk permits.