500–524 Third Street
South Of Market · San Francisco, CA 94107
Permit history
-
Nov 1990
Replace existing fixed window with new door.
-
Jun 1997
Cti-1 floor 5th el me sp.
-
Jun 1997
Cti-1 3/f el me sp 3/f.
-
Jun 1998
Reroofing.
-
Aug 1998
Replace existing passenger elevators, new storefront entry.
-
Jan 1999
Mmi-1 3rd floor el me l/s sp.
-
Feb 1999
Mm-1 2 el me 3rd floor.
-
Apr 1999
Oti-1 7.
-
Dec 2000
Oti-1 4th floor el, me, sp.
-
Sep 2002
Oti-1 1st floor el, me, sp.
-
Nov 2002
Oti-2 1st floor el.
-
Sep 2004
Oti-1 on 4th floor. el.
-
Oct 2004
Oti-2, 4th floor, el.
-
May 2012
Suite 455, new interior partitoins, new doors, new finishes, paint and carpet joining suites, relocate e light fixtures.
-
May 2012
T.i. suite 455 new interior partitions, new doors, new finishes, paint and carpet.
-
Aug 2012
Suite 110 ti - demolition of partition walls & carpet. build new walls, install new doors/frames/hardware, install interior glazing, t-bar ceiling, mechanical, electrical, hvac split sytem & fire sprinkler under separate permit.
-
Dec 2013
T.i. on 3rd floor to demolition and construct new non-structural partitions doors, millwork, & finishes, mep life safety and sprinklers on seperate permit.
-
Dec 2013
Mechanical electrical title 24 for full floor ti on 3rd fl to demolition and construct/relocate lighting and hvac equipment; compliance with ord. 155-13 not required.
-
Dec 2013
Structural plans to remove structural partitons and reinforce openings on 3/f t.i. please refer to permit application 2013.1219.4593. compliance with ordinance #155-13 not required. excavation <50 cu. yd.
-
Jun 2014
3rd floor: 90 new pendant hds, 32 new modifed upright hds, tenant improvement reference 201312194593; maher n/a.
-
Jun 2015
This project consists of the removal of existing non-compliant pipe handrails within two of the building existing stairwells & installing new handrails & guardrails that meet the disabled access. n/a maher ordinance.
-
Jan 2016
Disabled access barrier removal project. gr fl new code compliant restrooms, new partitions, minor mechanical, electrical, plumbing, fire sp, alarm. mep, fire, alarm design build interim/maher.
-
Mar 2019
Suite 305. sub-dividing the existing wired office space into two offices suites. the secondary space will be leased to a sub-tenant. the existing accessbile restroms and break room will be shared by the two office suites. n/a maher.
-
Nov 2021
Suite 110: interior renovation: new ceiling tiles, new light fixtures, new flooring throughout. selectrive demolition and construction as shower on plans. deferrered mep & fire/life safety. maher n/a.
-
Jan 2022
Ste 110 mep permit: electrical - power receptacles revision and lighting alterations. plumbing - replace sinks, add under sink mounted waterheaters. ref. permit 202111122242.
DBI holds 96 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 96. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update