Metreon
135–155 4th Street
-
Jun 2011
Interior remodel of existing metreon event space. new finishes in existing lobby and event space. new finishes and fixtures in restrooms.
-
Aug 2011
Basement b1 and b2: modify sprinkler pipings for new wall and elev. 1stfl: modify sprinkler piping for new demising walls and clgs in food court area 1 (fc1). 2nd fl: bring speaker system back to shell conditions for future retail space.
-
Oct 2011
Fc07: tenant improvement of newly remodeled space into quick service retaurant/kiosk. work involves adding new commercial kitchen and new food prep service area.
-
Oct 2011
Space fc-02: new quick service restaurant in food court of metron remodel.
-
Oct 2011
Space fc-6 - "fire wood cafe" - new drywall partitions, ceiling, lighting, flooring, finishes, new kitchen equipment. sprinklers and fire alarm under separate permit.
-
Nov 2011
Ticket box t.i.-new wall partitions, wood casework, equipment, signage & finishes. core & sheel approved under permit application 2010-0908-0463.
-
Nov 2011
Fire alarm system on all floors. modify existing fire alarm system. provide new devices, relocate & demolition existing devices. provide firefighter's smoke control for atrium smoke management system.
-
Feb 2012
Tenant improvement to new restaurant super duper burger. work include ti of existing shell to self service restaurant. include main dining space with mezzanine.fire alarm and sprinkler under seperate permit.
-
Mar 2012
Space #fc-10 - remodel a space in metreon food court to become a filipino food kitchen. hood & duct fire suppression system separate permit.
-
Apr 2012
2nd floor fire alarm build out. add to exist system. 1 control panel, 4 power supplies, 3 annunmators, 3 polls, 9 smokes, 2 heats, 15 duct smokes, 1 monitor module 10 relay modules, 139 speaker/strobes, 80 speakers.
-
Apr 2013
Space #1050 - t.i. for restaurant "noodles & co." walls, ceiling, finishes, lighting, new plumbing, hvac units.
-
Aug 2015
New speaker, seating, railings installed. floor and wall finishes replaced.
-
Oct 2015
Install new unmanned verizon wireless telecommunication facility. add 1 ball antenna. add 18 rrhs and 3 surge suppressors, place 1 6pas antenna and add 1 microwave on roof mounted tripod. temporary site 4 months (from permit issuance).
-
Mar 2016
#3000- interior t.i. of existing theatre including new lighting, tiles, carpet, new seating.
-
Apr 2016
Suite 300 - cinema tenant interior remodel for auditorium #13 within an existing mall building.
-
May 2016
Verizon wireless proposing to add one ball antenna, permit the existing temp ball antenna & add a panel antenna. both sectors will be behind a frp screens painted to match the existing building. new equipent will be inside building in (e0 equipment room, including two battery cabinets.
-
Feb 2017
Working in common area. 4th floor: subdivide event space. redesign prefunction lobby, access to event space, restrooms, meeting rm, coat rm, office, hallway & relocate existing warming kitchen, new mep work.
-
Dec 2018
1/f: sharetea: existing tenant interior remodel, relocating existing equipment, install glaze above existing wall, lighting replacement, plumbing. maher n/a. across from amc ticket counter.
-
Mar 2019
Install a temporary structure in center of pocket park, acting as an art installation for launch of new product for tech brand.
-
Jan 2025
Reroofing (no hot works).
-
Feb 2025
Suite fc8-interior ti install tap room bar. replacing an existing cafe no change of occupancy, no exterior alteration. new work includes minor interior demolition of existing finishes and construction of new interior finishes, new interior storefront new furnishings and equipment. mep deferred.
-
Jan 2026
#3000 int'r modifications to an existing auditorium, amc screen x projection technology, including installation of side-wall projection equipment; modifications to the existing screen and new interior finishes. entry upgrades include updated finishes and a new entry way illuminated sign. life safety.
DBI holds 169 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 169. 4 of them are nominal $1 street-space or sidewalk permits. 3 expired or cancelled permits are not shown. Instacart lists Target at 789 Mission Street. EAS holds 789 Mission Street with no parcel at all, and its point falls inside seven active parcels — this one and the six sharing map 3723114, which sf-parcels records as 763 Mission Street. EAS files both 155 4th Street and 763 Mission Street on 3723113 and puts no address on the 3723114 set, and the Department of Building Inspection files every permit at 789 Mission Street, one of them a tenant improvement naming the Target store, under block 3723 lot 001, a lot sf-parcels no longer carries.