  1. 1899

    The site was first built on in about 1899, and between then and 1923 held stores, a saloon and dwellings. An older commercial building stood on its northern corner until about 1956.

    260 Fifth Street Project DEIR, SF Planning Dept., 2009
  2. 1923

    A two-storey reinforced concrete warehouse of 1923 by the architects the O'Brien Brothers, with the Meyers Brothers as contractors: a rectangle 275 feet by 75 feet under a flat roof, its long Clementina Street side divided into thirteen symmetrical bays. The blind Tehama Street wall later carried a painted mural of the Golden Gate Bridge. Its offices were long those of Bill Graham Presents.

    260 Fifth Street Project DEIR, SF Planning Dept., 2009
  3. Apr 1987

    Install new partitions around offices & accounting space.

    Complete Permit 8704679 $$$ $12,000
  4. Jun 1990

    Seismic upgrade.

    Expired Permit 9011883 $$$ $150,000
  5. Aug 1990

    Reroofing.

    Complete Permit 9015856 $$$ $85,000
  6. Aug 1990

    App #9011883 in process (handicapped access appeal.

    Expired Permit 9016241 $$$ $85,000
  7. May 1991

    Cti-1.

    Complete Permit 9109441 $$$ $30,000
  8. Dec 1998

    Interior remodel on an existiong shell new gyp bd. walls.

    Expired Permit 9826201 $$$ $50,000
  9. Jan 1999

    Interior remodel, add new partitions & lighting.

    Complete Permit 9900740 $$$ $30,000
  10. Aug 2004

    Replace gypsum board and repair water damage.

    Issued Permit 200408131583 $$$ $19,500
  11. Jun 2011

    Erect a mixed use residential 182 units building.

    Complete Permit 201106017202 $$$ $35,000,000
  12. Jan 2012

    Demolition of two story office building.

    Reinstated Permit 201201303166 $$$ $250,000
  13. Mar 2012

    Shoring during excavation at site. new construction under separate appln #201106017202.

    Complete Permit 201203196331 $$$ $40,000
  14. Mar 2012

    Excavate & grade site mitigation. new construction under separate application #201106017202.

    Issued Permit 201203196312 $$$ $100,000
  15. Oct 2012

    Install tower crane, create & operate according to all governing standards. per sfdbi ab-23.

    Complete Permit 201210041285 $$$ $188,934
  16. Feb 2013

    Fire sprinkler system - appln #201106017202.

    Cancelled Permit 201302220742 $$$ $260,000
  17. Jun 2013

    Addition of a fire alarm system for the entire building(fire alarm system).

    Cancelled Permit 201306068809 $$$ $350,000
  18. Sep 2013

    Building interior signage submittal for new building. ref permit application 2011/06/01/7202. emergency evacuation signs per sffd bulletin 2.11 by signage contractor under separate.

    Cancelled Permit 201309177060 $$$ $70,000
  19. Dec 2013

    To install 6 projecting flag signs.

    Cancelled Permit 201312113924 $$$ $15,000
  20. Jan 2014

    Fuel oil system piping. installation of generator will be under separate permit. ref. app. to new building. #201106017202 compliance with ordinance 155-13 not required.

    Issued Permit 201401085840 $$$ $65,000
  21. May 2014

    Installation of 400kw diesel generator on roof. fuel oil piping system installed under seperate permit # 201401085840.n/a maher.

    Issued Permit 201405307072 $$$ $200,000
  22. Feb 2015

    Re-submittal of fire alarm as-built drawings permit no. 201106017202 addendum no.8 - fire alarm. n/a ordinance #155-13.

    Complete Permit 201502027250 $$$ $56,408,000
  23. Jul 2015

    Change of occupancy from m to b occupancy - fire time tenant improvement for a retail space at ground floor shopping center. landlord is provided shell space intended for a retail. new work includes interior lighitng, mechanical, plumbing & electrical work. ref permit application 201106017202.

    Complete Permit 201507201892 $$$ $185,000
  24. Apr 2016

    Change of use for limited cafe space, kitchen, storage space, seating, ada restroom, nw fixtures and finishes. sprinkler under separate permit. n/a for maher.

    Complete Permit 201604154955 $$$ $90,000
  25. Oct 2017

    Dental office ti on ground floor. new partition walls, new paint, new cabinets, new water & waste lines, vac, new lighting & power plan, new hvac layout new ceiling tiles.

    Complete Permit 201710100790 $$$ $110,000
  26. Jun 2021

    Errcs das upgrade as per ahj requirements. removing existing das and installing new approved das. removing and upgrading donor antenna.

    Complete Permit 202106092009 $$$ $30,000
  27. May 2022

    Legacy errcs system failed testing. adding additional antennas to cover 2 critical areas - stairwell & elevator. will use armored coax that meets level 1 survivability.

    Filed Permit 202205265079 $$$ $80,000

DBI holds 54 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 54. 9 of them are nominal $1 street-space or sidewalk permits.