Sep 1983
To create sandwich shop.
-
Sep 1983
Parapet safety program.
-
Jun 1988
Rebuild store front, frame walls & mezz, install drop clg.
-
Nov 1988
Sprinkler system.
-
Jun 1990
Paint store one stainlees sink, utility sink.
-
Dec 1996
Repair building fron rusted/damaged canopy overhang/comply with nov.
-
Jul 1997
Attach fire hose standpipe to sprinkler.
-
Feb 1998
Repairs per n.o. v. # 199602793-199710526.
-
Apr 2003
Install 20 steel channels under existingside walk.
-
Jan 2004
Rehab room's in res. hotel, change carpets, repair walls & paint throughout for nov#200447074.
-
Mar 2007
Tenant improvement to commercial space, connecting to existing lobby to be used as community room & officess for non-profit manager's of residential rooms. hvac = design build. complaint #199602414.
-
Sep 2008
Reroofing.
-
Oct 2008
Move existing gate, install new mail boxes, install handrails. to comply with nov3200864913 issued july 23, 2008.
-
Feb 2011
Customary sign maintenance plan for general advertising sign structure.
-
Jun 2012
Repair work per nov 201285713. provide reinforcement to support the brick wall being separated from top portion of brick wall near the roof level to repair vertical crack at side of building facing jessie st. also to comply with 199602414 and 201285713 and 201226061.
-
May 2014
Replace existing sidewalk to new concrete sidewalk above existing basement, n/a maher to comply with nov #201285713.
-
Jul 2016
T i to existing ground floor retail space. the portion of building containing sro use is not part of the scope. scope of work includes demolition of existing toilet room and construction of interior walls, accessible restrooms. maher na.
-
Aug 2016
To obtain & complete all work approved under permit application 2014-0512-5484. all work is complete. n/a for maher.
-
Jan 2017
Provide a fire rated door at the entrance to the basement were there is a screen door now. to comply with notice of viovlation #201642691 - 90 min door with door closer.
-
Jan 2018
Revision to pa 2016-0728-3624 relocations of plumbing fixtures and equipments in cafe and restroom. construction of full height wall between cafe and clean up space and inclusion of rcp/lighting plan and mep drawings. change of use under pa 2016-0909-7253. change to exterior facade under pa.
-
May 2018
Install 17 head & tenant space on ground floor only per nfpa #13 ref pa 2018-0130-9892; n/a maher.
-
Oct 2020
Repair in kind: 20 doors/jams from firefighter entering room durning 10/18/20 fire and comly with nov 2020061651.
-
May 2025
Repair in kind.lubricate and paint accordian ladder, paint windows where needed, paint rusty sheet cornices. patch/remortar cracked brick veneer, cornice and wall on roof and along mortar joints.
-
Jun 2026
New office ti within existing storefront footprint @ main level and mezzanine level floor.
DBI holds 48 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 48. 3 of them are nominal $1 street-space or sidewalk permits.