150–160 9th Street
Hotel · South of Market
-
1908
Built.
-
October 1971
The El Dorado residential hotel was counted among the neighborhood's standard-condition residential hotels, with 60 units and five vacancies recorded.
-
circa 1975 to 1985
The Redevelopment Agency photographed the property.
-
1976
The Golden Rivet, a bar, occupied this address from 1976 to 1980.
-
1981
The Web, a bar, occupied this address in 1981.
-
1982
The Rivet, a bar, occupied this address from 1982 to 1983. It was also known as the Golden Rivet.
-
Mar 1982
Additions alterations or repairs.
-
1984
The Bullet, a bar, occupied this address in 1984.
-
Sep 1991
Remove approx. 100 ft stucco, repair dry rot damage re stucco.
-
Feb 1993
Tenant improvement to ground floor space - office use.
-
Jul 1993
Install an extension of the eisting fire alarm.
-
Nov 2002
Repair sheetrock due to fire damage.cmly pid 200225360 & dad 200006484.replace 6window, patch roof, skyli.
-
May 2003
Revise approval app#200103073649 to add ventilation system to food preparation area per inspectors i.
-
Apr 2006
Cut one opening for new door3'0"x6'-8" between two separate spaces ownedd by same non profit and within same building, located at g/f, 20% upgrade at restroom door.
-
May 2013
To comply with ordinance 029-13 only. installation of grab bars in sro at the following location.
-
Apr 2019
New siding @ washburn elevation, move electrical meters and main, new accessibility upgrades. no structural work. no vertical or horizontal addition.
-
Sep 2020
Seismic strengthening measures to comply with sq ft soft story ordinance. no vertical or horizontal addition. no change of use.
-
May 2023
Mayor dir 13-01. 100% affordable housing. comprehensive alterations, upgrades, & repairs to existing el dorado res. hotel/existing sro 4-story 57 units to increase to 62 residential public housing sleeping units.
-
Jun 2024
Retrofit existing fire sprinkler systen. install all new sprinkler heads and control valves at all floors.
-
Jan 2025
Exterior siding repairs at washburn street elevation: interior wood framing repairs for existing walls and joists from gound fl. to roof(unit stack x 20, x21, x22) and interior finishes repairs. all other gray out scope of work on plans under seperate approved permit application #202305026865.
-
Jun 2025
Reroofing single ply roofing. flashings/ coping metal. sri=16min (no hot work).
-
Oct 2025
12 evacuation paln maps -basment, 1/f, 2/f, 3/f & 4/f for fire review only. ref #202305026865.
-
Jan 2026
Fire only: install emergency responder radio coverage system.
DBI holds 34 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 34. 3 of them are nominal $1 street-space or sidewalk permits. 8 expired or cancelled permits are not shown.
Nearby
- Western Manufacturing Company Building Same street
- 170 9Th Street Same street
- 140–142 9Th Street Same block
- 190 9Th Street Same block
- 60 Washburn Street Same block
- 42 Washburn Street Same block
- 775–795 Minna Street Around the corner
- 770 Natoma Street Around the corner