223–225 9th Street
4-unit apartment building
-
1910
Built.
-
Feb 1994
Proposed convert commercial space to live work unit.
-
Mar 2009
Disabled access features to establish medical cannabis dispensary; revision to complete work and obtain final inspection for work approved under permit application 200503298691.
-
Mar 2013
#3- bathroom demolition as needed, provide & install 20 amp g.f.i. with one receptacle, light fixtures, switch leg at kitchen, level floor and install tile, replace 7 light fixtures with like kind. bathroom: new toilet, lav. sink and shower pan. bathroom lighting shallcomply with cec150(k)10.
-
Mar 2013
To obtain final inspection for work approved under permit application 9618585; all work is complete.
-
Apr 2013
To obtain final inspection for work approved under permit application 9618585. all work is complete.
-
Sep 2013
Per nov# 201305841 item #3, #4c & #2: framing repairs and incomplete handrails- remove framing and trap door leading to basement, provide handrails at front and rear stairway.
-
Feb 2022
Repair damaged apt unit from fire 2 rooms.
-
May 2024
Comply with nov 202307567 - remove storage shelves.
-
Aug 2026
Comply with nov#202307567. ti improvement, remodel existing restroom to ada compliance.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline. 10 expired permits are not shown.
Nearby
- 209 9th Street Same street
- 231–233 9th Street Same street
- 790 Tehama Street Same block
- 201–205 9th Street Same block
- 235–239 9th Street Same block
- 249–251 9th Street Same block
- 1301–1315 Howard Street Around the corner
- 1325–1331 Howard Street Around the corner