249–251 9th Street
Hotel
-
1913
Built.
-
Oct 1986
Modify existing sprinkler system.
-
May 2002
Voluntary upgrade of existing bathroom to an accessible bathroom on ground floor. barrier removal only.
-
Jan 2007
Existing garage room with stainless steel surround.
-
Apr 2013
To obtain final inspection for work approved under permit application 8613069 all work is complete. to clear nov# 200236433 to comply with res. hotel sprinler ord.
-
Apr 2013
Remodel room #'s 3, 8, 10, 15, 17, 19, 20 & 21 (8 rooms total) in kind. remodel 4 common area bathrooms in kind with new toilet & bathtubs. no structural work.
-
Jun 2013
To comply with ordinance 029-13 only, installation of grab bars in sro, 4 bathrooms, toilets, showers & tub.grab bar min. 250 lbs load.
-
Mar 2015
Like for like voluntary fire alram system replacement. rpleace existing control panel with new at the dame location. replace existing 7 smoke detectors & 5 pull stations with new. 2existing bell will be tie-in to (ne) control unit. maher - not req'd.
-
Mar 2015
As-builts to permit application 2015 0313 0817 delete 1 smoke detector from 2nd & 3rd floor. install monitor module on 2nd floor to connect flow switch to existing control panel. naher- not req'd.
-
Nov 2015
Soft story: install new moment frames & shearwalls to comply with sfbc chapter 34b. compliance method: 2012 iebc appendix chapter a-4. maher na.
-
Mar 2018
To comply with nov 201830511: remove existing kitchen put a new one in.
3 nominal $1 street-space or sidewalk permits are omitted from the timeline. 1 expired permit is not shown.
Nearby
- 244 9th Street Same street
- 255 9th Street Same street
- 782–784 Clementina Street Same block
- 235–239 9th Street Same block
- 231–233 9th Street Same block
- 776 Clementina Street Same block
- 1301–1315 Howard Street Around the corner
- 45 Dore Street Around the corner