149 Bluxome Street
South Of Market · San Francisco, CA 94107
Permit history
-
Apr 1984
Install sprinklzrs and 2 bathroom, and partitions.
-
Jan 1991
Seismic upgrade per attached plans.
-
Jan 1992
Parapet bracing.
-
Jul 1994
Seismic upgrade and handicap building with mis mechanical & electrical.
-
Mar 1995
Rev permit application 9411766. overhd racks for clothes distribution.
-
Oct 1999
Demolition existing inter partitions, abandoned electrical/plumb device/.
-
Feb 2000
Funish and install hval systems only.
-
Mar 2000
Street space.
-
May 2000
Office buildout for t/i (no demolition), creation of offices to 2 floors & basement.
-
May 2000
Seismic upgrade new handicap access. entry stairs elev/resrm.
-
Jul 2000
Street space use.
-
Sep 2000
Alter existing system for seismic upgrade install new backflow device.
-
Oct 2000
Sprinkler system.
-
Jan 2013
Ti to include demolition of non-structural partitions, millwork ceiling, finishes. construction of non-structural partitions. mep, life safety, fire sprinkler under separate permit.
-
Jan 2013
Demolition of existing non structural interior partitions, doors, frames, hardware * finishes. construction of new non structural partitions. m.e.p & life safety under seperate permits.
-
Feb 2013
Basement and 1st floor: architectural revision to app#201301147903 to make minor alaterations to original approved permit.
-
Feb 2013
Fire sprinkler system - relocate 9, add 16 & delete 6 pendent sprinklers. t.i. #2013.01.17.8215.
-
Feb 2013
1st, 2nd, and basement floors: install 13 ceiling mount strobes, install 29 ceiling horn-strobes, install 1 booster panel, install 1 signal module, install detectors, install 11 control relays. ref app#201301178215.
-
Feb 2013
Revision to permit application 2013-01-17-8215. to add (5) five additional private office including structural.
-
Dec 2016
To confirm use as office. basement, 1st & 2nd floor: modifications of existing tenant suites to incconstruction of non load bearing partitions, selective demolition, new millwork & finishes. mep under sep permit mahre na.
-
Jan 2017
Basement, 1st & 2nd floor: mechanical work for ti. new vrv fan coil units, new transfer fan and new exhaust fan. no new fsds also ele work maher na.
-
Feb 2017
Electric double faced sign, illuminated. maher na.
-
Feb 2017
Add, relocate and remove fire sprikler per tenant improvment 22 add, 29 relocate, 6 remove. ref 201612296150. n/a ordinance#155-13.
-
Mar 2017
Basement, 1st floor, and 2nd floor: installation of new notification devices on basement and 2nd floor. removal & relocation of existing notification devices at same level of light fixtures/mechanical ducting. installation of new duct smoke detectors for new mechanical units on 1st fl. & 2nd fl.
DBI holds 29 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 29.
Not yet documented: the developer, the early tenants and the date of the last recorded sale. Submit an update