850 Bryant Street
South Of Market · San Francisco, CA 94103
-
1960s
Photographed.
-
1961
The San Francisco Police Department's Hall of Justice / Southern Police Station.
-
September 1966
James A. Martin photographed the property.
-
September 1966
James A. Martin photographed the property.
-
Jun 1989
Removal of existing access raised floor.
-
Nov 1990
Mechanical smoke evacuation system, security doors.
-
Dec 1990
Erect a med/psych work furlough intake system facility.
-
Jan 1995
Selective demolition, remodel & upgrade of existingwomen's locker.
-
Feb 1995
Horizontal.
-
Jul 1997
Voluntary barrier removal per sq ft building code.
-
Dec 2001
Construct 2 shafts for hvac air intake & exhaust.
-
Dec 2006
2nd fl, room #201 - tenant improvement - courtroom renovation and court holding facility.
-
Oct 2007
Remove architectural barriers. work includes barrier removal at various existing restrooms and drinking fountains in common, court & tenant areas. includes various signage for evacuation, exiting, directional and stairs.
-
Apr 2008
Ventilation improvement work for 6th & 7th floors of hall of justice building. the work includes replacement of supply & exhause fans, filters, and recondition of exhaust fan for 4 fan rooms.
-
Jul 2008
Installation of new fire alarm system in basement, 1st and 2nd floors. new xls500 will be interconected with ex. system for the cornor's building and the panell located on the 6th floor serving the jail. new grahic annuciator at the entrance and remot lcd at the boiler rm.
-
Oct 2009
City job - ti work to ccsf office of the chief medical examiner at the hall of justice. concert existing confrerence room into 2 doctor's offices. new unisex toilet ada compliance. work on 1st/street level. interior work only.
-
Dec 2010
Installation of two 1, 000kw generators. work includes installation of fuel oil, suppy piping, and pumping system connecting to existing fuel tanks, electrical switch board, electrical raceways, conduit, wiring, and pull boxes.
-
May 2011
San francisco jail. two chiller replacements in-kind on roof. approx same weight.
-
Jun 2011
Phase ii-upgrade of fire alarm system on the 3rd, 4th, 5th floor, of hall of justice, including the medical examiners building. work includes installation of new fire alarm initiating & notification devices, integration of new devices into the existing system, testing of the new devices & remodel ofexistingdevices.
-
Nov 2011
Select demolition of internal walls and finishes. install of new interior walls, 2 new restrooms (non public) and associated utilities. new furred ceiling, new raised floor. new finishes. fa, sprinkler, & occupant load calc's separate permit.
-
Nov 2012
Replace existing 535" worthington r-11 chiller with a 425 "new york" r-134a chiller.
-
Jun 2013
Basemt/ground level -replace existing 535 "worthington" r-11 chilles. provide a refrigeration machine rom enclosure with correct exiting, rating & ventilation. provide refrigerant exhaust purge sys along with monitoring & all code required alarms. upgrade all mechanical controls with new ddc sys.
-
Aug 2013
As built fire alarm system, additional 4 smoke detectors, 4 horn/strobes (ref. permit 201106158191) floors 3, 4, 5 phase ii changes.
-
Aug 2014
6th & 7th floor. installation of 2 remote fire alarm panels & the replacement of all existing fire alarm devices for floor 6 & 7. ** maher: compliance with ordinance no# 155-13 not required **.
-
Aug 2019
Renovation of existing commercial kitchen of county jail #2. work inlcudes architectural, structural mep work in support of food service improvement. n/a for maher.
-
Oct 2021
Rev to pa201908199221: new equipment and finiehes to the officers dining room, new flooring i the service corride, new flooring for the 2/f central supplies & treatment room; new counter and cabinets, sink, faucet and eye wash in the treatment room and work to the existing dark room on 2/f.
-
Dec 2021
Modernization/upgrade of elevator #2, # new machine and microprocessor baded controllers as well as new suspensions and door operating euipment. decommissioning of elevator #4 and #% removal of hoise, compensation ropes mechanical fastening hoistway.
-
Jul 2026
Replace existing chiller in existing underground chiller-boiler room. work includes the removal of the existing chiller, installation of the new chiller, associated piping and electrical work, testing and commissioning. no change in occupancy, floor area, building use, or mean of egress.
-
Aug 2026
Replace existing digital controls of each ahu, controller of vav box, install electrical feed to new temperature control panel, install new temperature control panel. install new thermostat & replace building automation system.
DBI holds 73 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 73. 2 of them are nominal $1 street-space or sidewalk permits.