1964
Built as an industrial building, associated with P.E. O’Hair Co. Building.
-
May 1983
Remodel existing office space.
-
Feb 1984
Remove 2 wood frame shed building paving. install pipe store.
-
Sep 1997
New site gates.
-
Sep 1997
New site gates installation & new structural modification.
-
Sep 1998
New partition s& doors at exist warhouse building & misc site.
-
Jun 1999
Vertical addition.
-
Jun 1999
Provide fire alarm per plans.
-
Oct 1999
Tenant improvement previous app #9911655.
-
Apr 2000
Fire sprinkler work for tenant improvement.
-
Dec 2003
Barrier removal only. this permit cover drywall work only for elevator shaft & elev.room for new.
-
Mar 2006
Installation of new t-mobile wireless telecommunications network including (1) antenna & equipment on the rooftop.
-
Nov 2006
Grade beam modification & new decorative canopy @ conversion of new interior space to lobby. mep under separate permit.
-
Jul 2013
Remove all existing t-mobile microcell equipment and replace with one new bts equipment cabinet in an existing equipment room on 2nd floor.
-
Oct 2013
2nd floor tenant build-out consists of new partitions, electrical, lighting, hvac & finishes. mep under seperate permit.
-
Aug 2015
Ti to existing building, accessibitlity upgrades new tenant entry, accessible path of travel. no change of use as part of this permit. compliance with maher ordinance3 no. 155-13 not required.
-
Jul 2018
Tmobile intall 4 new antennas in 2 new frp screens all on rooftop. install coax cables, 2 tma antennas, remove 1 antenna, antenna mount, coax cables.
-
Jul 2020
2nd fl. demolition of existing partitions and associated power/data floor finishes, ceiling, lighting, construction of new partions doors, power and data, finishes, lighting& millwork all work to occur on the 2nd fl. of a 3-story building, tenant suite is currently vacant, mep, life safety & sprinler system.
-
Jul 2020
Demolition of existing partitions & associated power/date, floor finishes, ceiling & lighting, construction of new partitions doors, power/data lighting, millwork & finishes. all work to occur on the 3rd fl of a 3-story building. tenant suite is currently vacant. mep, life safety & sprinkler under deferred.
-
Jul 2020
1/f: demolition of existing partitions & associated power/data floor finishes, ceiling, lighting, construction of new partions doors, power & tele/data, lighting, millwork & finishes, all work to occur on the 1st floor of a 3-story building. tenant suite is currently vacant. mep, life safety & sprinkler deferred.
-
Oct 2020
(mep) 3rd fl tenant t.i for revised hvac, new lighting with controls, new power outlets, new plumbing to restroom and break area. ref arch permit application 202007069650.
-
Dec 2020
Fire sprinkler permit. relocate 67, add 9 and delete 17 sprinklers on the 3rd floor. t.i. #2020-0706-9650.
-
Dec 2020
Fire sprinkler permit. relocate 55 add 8 and delete 4 sprinkler heads.
-
Dec 2020
Fire alarm. phase 1 of 3. a new facu will replaciing the existing facu. new notification devices to provide proper coverage. the existing lfd annunciator will be replaced by a new led annunciator.
-
Sep 2023
Install (6) new radios on mounts; install (6) new antenas on mounts, remove (1) antenna, install (2) new cabinets, install (2) new frp boxes.