489 Clementina Street
Industrial building
-
1928
Built.
-
Jul 1987
Remove exist window & put in garage door @ 1st floor.
-
Jun 1988
Electrical/partition walls.
-
Nov 1988
Reroofing.
-
Jan 1996
Ten improv--e z -- phot drk rm-- access upgrade, strwls & san.
-
Aug 1996
Tenant improvement, install ventilation in darkroom.
-
Dec 1998
Create work spaces for existing personnel/na change in usage.
-
Aug 2014
Removal & disposal of all existing non-structural inteiror tenant improvement including doors, suspended ceilings, etc. per plan. all existing sturctural walls, columns, & floor framing to remain. extent of exterior demolition is to remove exterior signage on folsom st. space remain vacant (per ab-017).
-
Oct 2014
1st fl leveling to finish grade elevation at building entry at folsom st wood floor framing as indicated on a 2.1 maher not required.
-
Apr 2015
Install new fire sprinkler system through-out building using exiting 4-inch fire service. and, 218 sprinklers, no underground, demolition permit application 201408153993. no t.i., n/a ordinance #155-13.
-
Jun 2015
Revision to permit application 2014.1210.3433- tenant improvement: construct new ramp, walls, lighting, doors, frames, new stair, atrium (double height space) & finishes. n/a maher ordinnace.
-
Jul 2015
Construct new ada restrooms @ 3rd floor, walls, plumbing, lighting, doors, frame & install new finishes, new stair to roof. hvac uner separate permit. n/a maher ordinance.
-
Sep 2015
Replace e roll up doors and reinstall previously boarded up windows to match existing of the building; maher not req.
-
Sep 2015
Reroofing: unit weight <5lbs, slope > 4: 12.
-
Nov 2015
Add work to permit 201507131365, build new walls, doors, frames, install new lights, cabinets, sinks, finishes, kitchen.
-
Nov 2015
2/f -build new walls, doors, frames, cabinet and sinks, build ada shower, install lights under seperate permit. n/a ordinance #155-13, separate sprinkler permit.
-
Nov 2015
3rd floor: all lighting & mechanical title 24 works (for 3/f only); refer to building permit 201511021418; maher n/a.
-
Dec 2015
To perform t-24 for lighting & mechanical system refer to building #201511051799. n/a maher ordinance.
-
Dec 2015
Revision to 201506048171. reconfigure floor plan/partitions. add title 24 for lighting control and new mechanical system. n/a maher ordinance # 155-13.
-
Dec 2015
Install new fire alarm system - one facp, one annunciator, one pull station, 5 smoke detectors, 5 horn/strobes, 13 strobes. n/a maher ordinance.
DBI holds 36 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 36. 2 of them are nominal $1 street-space or sidewalk permits. 6 expired or cancelled permits are not shown.
Nearby
- 459 Clementina Street Same street
- 675–679 Clementina Street Same street
- 275 Sixth Street Same block
- 251 Sixth Street Same block
- 261 Sixth Street Same block
- 277 Sixth Street Same block
- 270 6th Street Around the corner
- 240 6th Street Around the corner