290 Division Street
Office building
-
1924
Built as an industrial building, concrete construction, recorded as occupied by Richmond Sanitary Mfg. Designed by Powers & Ahnden.
-
Jan 1994
Parapet reinforcing.
-
Mar 2000
Oti-1 el, me, sp, 2nd floor.
-
Oct 2002
Erect a single faced wall sign.
-
Jan 2004
Replace burn wooden deck (delivery deck) with stair. replacement in kind.
-
Jul 2008
To remove general advertising sign at side of building facing 10th st. involuntary application to remove rooftop billboard sign, in compliance with admin law judge decision dated 7/14/2008 (290 division st, case #9562).filed under protest, all rights reserved pending judicial review of alj decision.
-
May 2009
Demolition and removal of existing exterior billboard mounted on north wall. existing billboard is of wood frame/plywood construction. the billboard is 14' high and 48' across.
-
Sep 2014
Reroofing.
-
Oct 2014
Install 1 non-illuminated projecting sign.
-
Jun 2015
2nd floor tenant improvement (gym) - add new showers & locker at existing mens shower/locker area. n/a marher ordinance.
-
Feb 2019
4th fl - all existing non-bearing/non-structural/non-fire/life safety walls removed to allow for future ti for specific needs. associate work in these walls, including electrical & data wiring, and misc cabinetry to be removed as well. no new work to be performed and existing base building system will not be affected.
-
Aug 2019
3rd floor: existing 3rd floor of a 4 story building to have all existing non-bearing/non structural/non-fire/life safety walls removed to allow for future t.i. for specific needs. associate work in these walls including electrical + data wiring, & misc. cabinetry, to be removed as well. no new work to be performed &.
-
Oct 2019
4/f: t.i.: new restrooms, to comply with current code, a break area, and conference rooms. open office space aera to allow for occupancy, including finishes, this work will also include the installation of a lift at main entrance. demolition for 4/f under pa201902213452. maher n/a.
-
Jul 2020
Parts & smarts fire alarm system.
-
Jan 2021
3/f: t.i. to be finished out to include conference rooms, new restrooms, and a break area. mep work will all be performed. ref demolition permit application 201908199142. maher n/a.
-
Sep 2021
Install 2 electric wall signs "shift".
-
Sep 2021
3/f -existing empty full floor (3rd floor) of a low rise office building is to be finished out, to include conf rms, new restrooms, any break area. plumbing, mechanical, any electrical work will be pulled under seperate permit prior demolition permit 201908199142.
-
Nov 2021
Remodel existing restroom to be ada accessible. no work will occur at the exterior of the building or the means of egress affected. permit application 201910094059 must be complete to final.
DBI holds 42 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 42. 6 of them are nominal $1 street-space or sidewalk permits. 7 expired permits are not shown.
Nearby
- 11–25 Division Street Same street
- 340 Division Street Same street
- 575 10th Street Same block
- 1000 Brannan Street Same block
- 560 9th Street Same block
- 530–540 Ninth Street Same block
- 590 10th Street Around the corner
- 44 Potrero Avenue Around the corner