5–9 Freelon Street
South Of Market · San Francisco, CA 94107
Permit history
-
Aug 1996
Remove partititon wall & reinstall new one.
-
Nov 1996
Install 1 awning 9'x4' projection x 3' high, install 2 poles.
-
Nov 2009
Project consists of demolition of existingdoors, partitions, ceiling, lighting, electric & tel/data receptables, stairs & finishes through both fls of a 2 story lowrise.const.of new walls, doors, stairs, ceiling/lighting, electrica, del/data receptables.exterior ramp parking re-striping. mep under separate permit.
-
Jan 2010
Revision to permit application 2009-1116-1321-revision to existing permit for 6 new posts/footing, shear walls in lieu of original walls & roof framing for hvac equipment.
-
Jan 2010
Provide new modifications to existing plumbing, hvac and electrical services to accomodate new t.i. under original permit #2008/1116/1321.
-
Mar 2010
Nfpa 13 office retrofit 73-sprinklers.changing heads to all be the same type-existing ug and meter- providing new 4" back flow preventer with meter.
-
Mar 2010
Reroofing.
-
Apr 2010
Sprinkler monitoring system per nfpa 72.
-
Apr 2010
Revision to permit application 2009.11.16.1321. revision to existing permit for statement on cover page pertaining to emergency lighting shown as delta 3, dated 4/2/10.
-
May 2010
Revision to e 0.1, 200911161321. title 24 wording corrections.
-
Feb 2014
Project consists of partial demolition of existing doors, partitions, ceiling/lighting, electrical and teledata, receptacles, stairs and finishes at both floors of a two story low rise office building. construction of new partitions, mezzanine doors project adds 650 sq ft. and modifies approx.1760.
-
Apr 2014
Rermove & replace exposed duct work. ref permit application 2014.0211.8326. n/a ordinance #155-13.
-
May 2014
Fire plan work -fire sprinkler t.i. add 11 fire sprinkler t.i. ref app#201402118326. n/a for the maher ordinance #155-13 & interim control.
-
Apr 2015
Construct new 3-story office building. ** maher: compliance with ordinance no# 155-13 not required **.
-
Jan 2018
The project is a new construction of a retail food facility in part of an existing bld. the retail food facility will consist of a kitchen, warehouse & front end arera. new mep work will be installed to accomodate the new retail food facility, (serve take out only) plumb to be design build. maher na.
-
Oct 2025
Ti for partial demolition of existing doors, partitions, ceiling, lighting, electrical and tel/data receptacles, stairs and finishes at both floors of a two story low rise office building. construction of new partitions, doors, glazing, ceiling, lighting, electrical andtel/data receptacles. project modifies.
-
Jan 2026
Reroofing no hot works.