928 Harrison Street
South Of Market · San Francisco, CA 94107
Permit history
-
Oct 1987
Auto storage & repair.
-
Jan 1988
Install exhaust fan on roof of warehouse.
-
Feb 1988
Install new overhead service door.
-
May 1988
Revised footingdetails, stairs location, ref. #8715737.
-
Aug 1988
Erect sign.
-
Aug 1988
Painted or other non-structural sign.
-
Jun 2021
Install: 2 utility transformers, 3 switch board assemblies, 10-350kw power unit, 20-173 kw dispensers to provide: ev charging stations, vehicle servie station services, restroom and louge facilites for customer use while utilizing ev chargers.
-
Aug 2021
Sign 1: install 1 illuminated single faced wall sign. "electrity america".
-
Aug 2021
Sign 2: install 1 non-illuminated wall sign. "entrance" inside store.
-
Aug 2021
Sign 3: install 1 illuminated double faced projecting sign. " electrify america".
-
Aug 2021
Sign 4: install 1 non-illuminated single faced wall sign. "exit only".
-
Aug 2021
Sign 5: install 1 non-illuminated single faced wall sign. "electrify america ev charging enter".
-
Aug 2021
Sign 6: install 1 non-illuminated single faced wall sign. "electrify america ev charging only".
-
Apr 2022
Provide part & smarts only for an emergency panel replacement, & waterflow monitoring system. all conduct boxes, fittings, installation of all devices is provided by others.
-
Jun 2022
1st fl: add 171. under mezzanine: add 22 sprinkler heads per t.i.. ref 202106182812.
-
Jul 2022
As built fire alarm system. ref ti #202204252888.
-
Jul 2022
Rev 202106182812: foam protection added toexisting beams in equipment platform area. low headroom signs added to all existing beam in equipment platform area/north access stairway to provide warning as professional approaches landing &existing beam. self-closing gate with low headroom sign added to bottom.
-
Feb 2023
Revision to bpa# 202106182812. minor mod to drive aisle in parking area & bollard layment @ chargers. 2 over current. protection devies added to main electrical room.
-
Oct 2023
As built ref 202207158541. revised as built sow: updataed addresses.
-
Jul 2024
Demolition of 2 side wall exhaust fans will be rmeoved from electrical room. motor controlled dampers will be removed from electrical rooms side wall louvers. install new 3 roof exhaust fans will be added to the electrical room. door closures will be added to electrical room.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline.
Not yet documented: the architect and builder and the early tenants. Submit an update