835 Howard Street
South Of Market · San Francisco, CA 94103
-
1913
The Pacific Telephone & Telegraph Company was operating a facility here by this year.
-
Aug 1986
Install new carpets, wall finishes, lights, handicap toilets.
-
Oct 1986
Alteration mezzanine to existing building.
-
Jan 1987
Appl. is for work to be done on 3rd floor only.
-
Jan 1987
Install a fire sprinkler system for the entire basement.
-
Feb 1987
Installation of fabricated steel stairs from basement.
-
May 1988
To complete work started under pa.#8613246.
-
Sep 1997
Equipment rm. elevator to confirm ada only.
-
Feb 1998
Temporary construction office accessible restrooms.
-
Aug 1998
2nd floor partitions, bathrms, relocate lights for temp use.
-
Jan 2000
Relocation of partition walls on 3rd floor, new accessible main entry, signage, restrm per/plans.
-
Dec 2002
Shoring & underpinning along property line due to excavation at adjacent property.
-
Feb 2003
Shoring & underpinning along property line due to excavation at adjacent property (under separate pe.
-
Jun 2003
Shoring & underpinning along property line due to excavationat adjacent property line -under sep per.
-
Jun 2007
Replacement window side & back. replace entry door on howard street only. howard street to remain.
-
Jun 2008
Tie in new 2 1/2 main into existing e" main in (basement) run new 2 1/2" main to 3rd floor to pipe 6 new window sprinklers.
-
Jun 2012
Exploratory soft demolition only. sq ft ab-017. all life safety infrastructure to remain. demolish existing non-structural interior partition walls. demolish existing t bar acoustical ceiling tile systems, 3rd floor level only.
-
Sep 2012
New interior finishes, new offices, new conference rooms, new break area & new reception. hvac & lighting seperate permit.
-
Oct 2012
3rd floor: electrical: provide and install light fixtures and electricity per plan for office t.i. hvac /mechanical provide and install hvac fans and ductwork from existing hvac unit per plan for office t. i.
-
Nov 2013
New interior floor finish throughout, new interior painting throughout, new break area, new office & new large conference room, new interior lighting & hvac. ref permit application 2013.0909.6244.
-
Mar 2015
Interior ti - 2nd floor 3 new private ofc 2 new teklephone/private call rooms reception area screen area.
-
Nov 2018
Provide new egress stair and restrooms at basement.
-
Aug 2020
Fire sprinkler coverage @ ground floor, modify fire sprinkler @ 3/f per nfpa 13 2016. t.i. area consists of (4) sidewall & (155) pendant sprinkler heads.
-
Mar 2021
Installation of a new fire alarm system with sprinkler monitoring. supply and install a facu, remote poower supply radio, remote annunciator, manual pull station, smoke detector, ceiling mounted horn strobes, wall mounted horn strobes, wall mounted strobes monitor module and addressable dual monitor.
-
Jun 2021
According to owner voluntarily provide fire sprinkler coverage at 2nd floor per nfpa 13 2016. t.i. area consists of (3) sidewall and (51) pendent sprinkler heads.
DBI holds 39 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 39. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. Submit an update