1095 Market Street
South Of Market · San Francisco, CA 94103
-
1946
The San Francisco Urban League had its first headquarters here after its incorporation in 1946.
-
Feb 1995
T/i remodel of existing closed food facility misc plumb electrical mch.
-
Apr 2002
Sign.
-
Oct 2004
Interior remodeling foranexisting restaurant, work include rearranding food preparation area, ***.
-
Dec 2004
Interior remodeling for an existing restaurant work include installing new kitchen equipment sinks storag.
-
Jul 2007
Interior tenant improvemnt for existing restaurant. work includes adding a sink and constructing a non-structural opening in the kitchen as shown on plan.
-
Aug 2014
Interior non-structural demolition on all floors, remove walls and ceilings as indicated on drawings; maher n/a.
-
Sep 2014
Change of occupancy from office to hotel. new 203 hotel rooms. new roof deck. add new story within existing structure. new stairs & elevator. ** maher: compliance with ordinance no# 155-13 not required **.
-
Dec 2014
Seismic renovation to 1095 market street foundation, basement & full structure.n/a for maher ordinance.
-
Jun 2017
Install evacuation map signs. n/a maher.
-
Jul 2017
Interior tenant improvement of warm shell space full serice restaurant with bar and commercial kitchen on 1st fl. entitlements approved for occupant with base building app under 201409116118.
-
Sep 2017
Revision to app#201409116118 s1: replace concrete slab in the designated region of the 3rd level of the building. the existing concrete slab has shown signs of significant spalling and needs replacement. concrete criteria consistent with original permitted drawings. n/a for maher.
-
Oct 2017
F/s ti: basement storage room 001 - add 8 sprinkler heads. install new preaction system. total 8. maher na.
-
Dec 2017
Revision to pa 2014-0911-6118 (s9) clarify and detail modification to the engine exhaust and vent piping. permit per field discussion with fire sprinklers; n/a maher.
-
Mar 2018
Pre-action detection & controls with in storage rm. basement.
-
Aug 2018
Column repair at grids 10/a (southwest corner) of the building between the 8th floor and roof. n/a for maher.
-
Dec 2018
Build-out tenant space restrooms. mep under seperate permit.
-
Apr 2021
This is to obtain final inspection for work approved under permit application# 201801309932. all work is completed.
-
Apr 2021
This is to obtain final inspection for work approved under permit application# 201704285215. all work is completed.
-
Apr 2021
This is to obtain final inspection for work approved under permit application#201709289880. all work is completed.
-
Apr 2021
This is to obtain final inspection for work approved under applicataion #201808036428. all work is completed.
-
Apr 2021
This is to obtain final inspection for work under permit application #201506118778. all work is completed.
-
Apr 2021
This is to obtain final inspection for work approved under permit application # 201706018199. all work is completed.
-
Apr 2021
This is to obtain final ispection for work approved under permit application # 201712156622. all work is completed.
-
May 2021
To install the new gamma nu root antenna and replace the bda with comba for the sq ft errcs compliance upgrade. all other components remained unchanged.
DBI holds 59 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 59. 13 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update