1035–1065 Mission Street
260-unit apartment building with a ground-floor store
-
December 3, 1970
The irregular lot, with 365 feet on Mission Street and 402.5 feet on Minna Street, was then a parking lot. The City Planning Commission approved, with six conditions, an automatic car wash and gasoline pumps on the northern part of the parking lot, the rest remaining parking.
-
May 1988
Demolish car wash and gas facilities.
-
July 1988
Three 10,000-gallon underground gasoline tanks were removed when the Chevron station at 1045 Mission Street was demolished.
-
Jul 1998
To erect 258 dwelling over parking, retail & office.
-
Jun 1999
Grading.
-
Oct 1999
Install automatic & manual fire-alarm system.
-
Mar 2000
Install fire sprinkler systems at res. apts. levels 2-4.
-
Jul 2000
Provide temporary sales office.
-
2001
Current structure built.
-
Sep 2001
Install new shelving, counters&bathroom to street level retail space. first time tenant.
-
Jul 2006
Remodel of existing building lobby scope of remodeled items occurs within the existinb building envelope. remodel includis: the demolition of existin case work and reelocation of existing mailboxes that are currently mounted in the casework, installation of new reception/security, storage desk within***.
-
Jul 2013
Interior renovation of primary building entry lobby & replacement of existing entry storefront.
-
Sep 2015
Relocate existing workout location at gr fl. a lounge will be installed in the vacated space. a corridor to workout area including new opening in a concrete wall. plumb, electrical, sprinkler, life/safety under sep permit.
-
Nov 2015
2nd floor one unit - install a new washer & dryer & new cabinets at kitchen; maher n/a.
-
Jan 2016
One unit -1st floor: install new washer & dryer. install new kitchen cabinets. maher na.
-
Feb 2016
One unit: install new washer and dryer. install new cabinets at kitchen. n/a for maher.
-
Feb 2016
Revision to app#201509146880 to allow for the addition of a wall to seperate the new lounge area into 2 rooms: smaller lounge and a new meeting room will have a break area installed in it, which will include a nw sink. this change will also rearrange the lighting and convenience power located in the.
-
Mar 2016
1st floor/fitness room: add mini split with fresh air intake. maher na.
-
Apr 2016
One unit: install new washer and dryer. install new kitchen cabinets maher not req.
-
Apr 2016
One unit install new washer and dryer. new kitchen cabinets. n/a for maher.
-
May 2016
Fire alarm ti to new gym room, lounge and hallway on gr fl. add 8 horn/strobes, 3 strobes, 1 smoke det, 1 relay module, 1 sync module to e fa system. ref ti 2015-0914-6880.
-
Jul 2016
One unit: install new washer and dryer. kitchen in kind remodel. n/a for maher.
-
Jul 2016
One unit: install new washer and dryer in bathroom. n/a for maher.
-
Dec 2016
Creat, fabricate: install evacuation maps for all 4 floors. maher na.
-
Jan 2017
One unit - install new washer & dryer (ventless). install new cabinets @ kitchen (kitchen remodel). maher na.
-
Jan 2017
One unit - install new washer & dryer (ventless). install new cabinets @ kitchen (kitchen remodel). maher na.
DBI holds 45 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 45. 1 of them are nominal $1 street-space or sidewalk permits. 2 expired permits are not shown.
Nearby
- 1026–1028 Mission Street Same street
- 1077–1081 Mission Street Same street
- 1087–1089 Mission Street Same block
- 1091–1099 Mission Street Same block
- 551 Minna Street Same block
- 535–539 Minna Street Same block
- 95 7th Street Around the corner