1201 Ortega Street
Sunset Parkside · San Francisco, CA 94116
Permit history
-
Mar 1988
Vertical addition.
-
Jun 1991
Reroofing.
-
Jul 2006
Grading.
-
Jul 2006
Convert first floors bathrooms to ada accessible, convert 2nd floor hallway into new classroom & new office and maintain 1-hr rated egress corridor. add 1 hr-rated partition & doors at existing east stairwell. install new rolldown smoke doors at elevator doors on each levels. no exterior work. no change.
-
Dec 2006
Interior soft demolition; basement, 1st & 2nd floor; demolish walls as shown on floor plan, remove a coustical tile ceiling & crid @ 1st floor of 1928 building. section only. all of 2nd floor; all gyp bd. ceilings in 1928 building section to be removed except @ historical main lobby; all gyp bd ceiling @.
-
Mar 2007
Basement 1st and 2nd floor; demolition, remodel and restoration of interior space at 1st and 2nd floor; basement scope update toilet room accessories and remodel of exit stair to meet curent building code requiremnt. sets include building architecturals structural electrical t-24.
-
May 2007
Fire sprinklers. basement = 11 spkr hds. 1st floor = 207 spkr hds. 2nd floor = 168 spkr hds. total 386 spkr hds.
-
Sep 2020
Enclose an office in existing hallway. install new wall door & mini split condenser.
-
Oct 2020
Building an exterior climbing wall.
-
Feb 2021
Construct stormwater bmps including 1 new lined rain garden, a cistern, and permeable pavement. new landscaping along the western, northern, and eastern edges of the campus. exterior work includeds excavation, disconnecting and capping downspouts, new underdrains, new irrigation system, trenching to.
-
Jul 2021
Convert existing boardroom to two separate offices.
-
Jul 2021
Create office room adjacent to main lobby. install 4 fire rated doors at library and 1 interior door between office at 2nd floor.
-
Oct 2021
To remove and replace existing sign with flat metal cut signage. (theatre erick moreau).
-
Nov 2021
Reroofing.
-
Mar 2023
New fixed rated transparant wall. installation in existing office.
-
Jul 2023
Scope includes removal of moisture damaged existing floor slab on grade to edge of walls in 2 rooms (class #117 & multi purpose room #129) on the 1st fl; installation of new concrete slab over 15-mil x-treeme wood below slab vapor barrier membrane. provide polished concrete finish in both rooms.
-
Aug 2023
Remove existing facp and replace with new notifier facp, replace existing annunciator with new color touch screen display, provide new class gateway which will connect thru a csm cellular data connection.
-
Jun 2024
Demolish & rpelace in-kind cocrete slab in courtyard, sog.
-
Jul 2024
New foundations for proposed courtyard canopy (no 202400636prj). add drainage and electrical conduits. finish slab under permit# 202406174654. no work above grade.
-
Nov 2024
1611 sq ft pavilion in existing courtyard (partial enclosure). new curtain wall and bifold doors at existing lobby. demolition planting beds/ new pavers set in sand. new egress path from ne corner of courtyard to 19th ave. mechanical and electrical under deferred permit.
-
Feb 2025
Ref 202411195309- new fire sprinkler to the courtyard addition by connecting to existing sprinkler system installed per n7pa13.
-
Apr 2025
Derferred electrical permit for new 1611 sq ft pavilion in existing courtyard (partial enclosure) ref: permit#202411195309.
-
May 2025
In kind replacement of existing wood windows sashes existing frames to remain. (street visible), on north, east, and west elevation.
-
May 2026
Basement: remodel of existing activities room in basement. demolition existing storage room/closet. demolition existing wall, new wall with doors. relocate existing furnace.
DBI holds 62 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 62. 6 of them are nominal $1 street-space or sidewalk permits.