1740 Sloat Boulevard
Sunset Parkside · San Francisco, CA 94116
-
after 1945
A First United Presbyterian church was built here after the war, one of the Parkside's postwar civic buildings put up in the “moderne” styles of the day.
-
Oct 1982
Building use: misc.
-
Jul 1983
Repair damaged portion of roof framing.
-
Jan 1996
Install new pcs antenna array on existing roof & radio equipt mod.
-
Jan 1997
Install new pcs antenna array on existing tower & radio equipmt.
-
Feb 1997
Const 3 panel antennas mounted inside existing steeple.
-
May 1997
Revise to appln #9702800 4 equipmt cabinets on steel frame.
-
Mar 1999
Lower fence to less than 6' and abate comp nov 9900052.
-
Nov 2007
Reroofing.
-
Apr 2008
Installation of a new at &t wireless telecommunications network including six (6) panel antennas & five (5) equipment cabinets. arch. only.
-
Nov 2009
Sprint. modification, installation of one equipment cabinet mezzanine, 3 rf panel antennas and 1 internet services exchange antenna, and 1 gps antenna inside existing church steeple.
-
Jan 2011
Instalation of an unmanned wireless telecommunication facility consising of (7) panel antennas for at & t within an existing church steeple and (5) equipment cabinets located on ground.
-
Apr 2011
Remove 1 existing t-mobile equipment cabinet & replace with 1 new t-mobile equipment cabinet in same location on lower roof area.
-
May 2012
Modification to an existing cellular facility. remove & replace 3 antennas. replace equipment cabinets. replacement of coax cableing & placement of rru on faux steeple. add gps antenna.
-
Jul 2013
Modifications of interior bracing, repair work only to sprint tower. no work on sprint antennas.
-
Jul 2013
Reroofing.
-
Nov 2013
Modifications to an existing unmanned at & t telecommunication facility consisting of installing 3 new rru's-11's.
-
Apr 2014
To modify an existing telecommunications facility, 3 existing panel antennas to be replaced with 3 new panel antennas with in existing cupola 3 new rrh units to be installed behind antennas with in existing cupola. 2.5 ghz equipment and 1 string of batteries to be installed with in existing equipment cabinets located on the ground floor.
-
Nov 2015
T-mobile propose to modify an existing wireless facility by 1) removing 3 existing antennas and replacing with 3) new antennas 2) removing 6 existing tmas and replacingwith 6 new tmas 3) install 3 new rrus 4) install 3 new diplexers.
-
Jul 2016
Att modification r and r 6 e antennas with 6 new antennas r/r 3 e rrus 11 with 3 ndw rrus 32 b2, install 3 new rrus 32, new dc6, 2'" innerduct, new dvs41, new xmv.no change to batteries.
-
May 2018
At&t mobility: r&r 7 existing antennas with 7 new antennas. install 9 new rrusl install new cabinets and other small equipment. remove all unused equip.
-
Jan 2019
Replace (3) sprint antennas inside existing church steeple.
-
Dec 2020
Modification to existing wireless facility. remove 3 antennas, 15 rru's, install 6 antennas, 9 rru's, 2 equipment cabinets. all new equipment will be installed in the existing 77.8' steeple.
-
Sep 2021
Antenna location: no work to be performed. equipment location: remove 12 e) m 12a155 ft batteries, remove 2 2106 gdm cabinet, install 1 6630 basbam. 1 diplexer, 3 rrus, 1 new h-frames, 2 ge recrifiers. 12 gs portalaca.
-
May 2023
Removal of existing sprint equipment due to merge of sprint with tmobile. scope includes removal of antennas, radio cabinets, and associated telecom equipments. sprint project: fs04xc020.
DBI holds 25 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 25.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update