1801 Vicente Street
Sunset Parkside · San Francisco, CA 94116
-
1924
The San Francisco Protestant Orphanage moved to the Parkside and built here on the “cottage” plan then replacing the single dormitory — six residential cottages around an administration building, meant to raise children in something closer to family groups. The campus is now the Edgewood Center for Children and Families.
-
Nov 1981
Additions alterations or repairs.
-
Mar 1982
Additions alterations or repairs.
-
Mar 1983
Upgrade existing williams cottage building.
-
Mar 1983
Upgrade existing stow cottage.
-
Oct 1986
Remove all interior plaster, repair all termite and dry rot.
-
Nov 1986
New construction wood frame.
-
May 1989
Alteration to existing partitions.
-
Oct 1989
Install sprinkler system.
-
Feb 1991
Horizontal addition.
-
Apr 1991
Install a complete automatic fire sprinkler system.
-
Apr 1998
Install fire alarms in 3 residence for children.
-
Jul 2001
Reroofing.
-
Nov 2001
Handicap ramp to gym, concrete const with ada handrail.
-
Nov 2005
Replacing existingconventional fire alarm pand with new addressable facp, replacing existingconventional devices with new addressable devices, add new devices to fa system.
-
May 2007
Reroofing.
-
Jun 2008
Renovation of existing commercial kitchen, including new food service equipment, mechanical, plumbing, and electrical. no structural work required. replace 3 rear windows in like kind.
-
Mar 2011
To erect 1 story office & classroom. (pre manufacture building).
-
Mar 2011
To erect 1 story green house building.
-
Jun 2014
Tenant improvement, renovation of dorm rooms & offices- paint, flooring, new lighting, rest/bathroom renovation, accessibility improvement. fire inspecter to field verify sprinkler and f/a coverage.
-
Nov 2014
Dimond cottage: interior remodel of an existing grade level kitchen including demolition and installation of new casework. no change to existing lighting. minor plumbing and electrical work.
-
Nov 2014
Stow cottage: interior remodel of an existing grade level kitchen including demolition and installation of new casework.minor plumbing and electrical work, existing lighting shall remain.
-
Dec 2020
Emergency panel replacement. replace the following existing fa equipment with new: (1) facu, (2) remote led annunciators.
-
Sep 2023
Safety retrofit of open interior stairways at stow cottage in the form of aluminum storefront with fixed tempered glass panels.
-
Sep 2023
Safety retrofit of open interior stairways at halleck cottage in the form of aluminum storefront with fixed tempered glass panels.
-
Sep 2023
Safety retrofit of open interior stairways at williams cottage in the form of aluminum storefront with fixed tempered glass panels.
DBI holds 56 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 56. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update