711 Eddy Street
Tenderloin · San Francisco, CA 94109
-
1982
An Older Men's Rap Group ran here from 1982, meeting fortnightly under a programme for older lesbians and gay men.
-
Sep 1988
New steel poles & safety glass windscreen around roof patio.
-
Apr 1989
Sremodel existing vestibule & canop-ly per drawings.
-
Sep 1990
Reroofing.
-
May 1992
Partition alterations, replace ceiling, carpet, rolldwn door.
-
Feb 1994
Install steel header for operable partitions.
-
Sep 1995
Tear off exist rfng & flshng-install similar in kind.
-
May 2001
Replace existing fire alarm system in building for all floors.
-
Oct 2009
Roof level-new guardrail system for all areas where existing parapet is less than 3'-6" orthere is no parpet or column. install safety tiebacks for schedules maintenance work on the building exterior. tiebacks are designed for attachement of a workers safety line & as a secondary tieback for couter weigh.
-
Oct 2013
Remove existing tubs, tile at tubs. replace with new tubs water proof backing, tile to match original.plumber to replace shower valve and waste connections with new. 20 total units including 1c, 2c, 3c, 4c, 5c, 6c, 7c. 1b, 2b, 3b, 4b, 5b, 6b, 7b, 8b, 9b, 10b, 11b, 12b, 13b.
-
Oct 2013
Remove existing tubs - replace with new tubs, water proof backing, tile to match original. plumber to replace shower valve & waste connections with new 50 total units, including: 1d, 2, d, 3d, 6d, 7d, 1e, 2e, 3e, 6e, 7e, 8e, 9e, 10 thru 13e. 1h thru 3h, 1j thru 3j, 1a thru 13a, 1f thru 7f, 1g thru 7g, 8t.
-
Apr 2018
Selective demolition of non-bearing partitions, doors, plumbing & lighting fixtures & finishes. proposed work includes new partitions, doors, soffits, finishes & lighting & plumbing fixtures. work includes limited pluming & mechanical. ** maher: n/a **.
-
May 2018
1st fl, one unit, one unit-d - demolition of walls, doors, exterior windows, plumbing fixt and accessories, floring, wall base, adding new rated shaft walls, new bathroom whoer, plumbing fixtures and acc., new finishes, wall base, limited plumbing & electrical upgrade///vif eer windows to be compliant 1030.
-
Aug 2018
Window replacement. main entrance, int. finish, kitchen & lobby casework, various accessibility upgrades including voluntary accessibility upgrade in 12% of dwelling units, renovation of existing roof deck, expansion of entry vestibule, new paving entrance, new roof, plumbing & electrical upgrades.
-
Jan 2020
Garage: relocate/add sprinklers to accomodate for plan revs & replace all bracing on existing 4" bulk main. 1st-13th floors: relocate/add sprinklers to accomodate for plan revs & replace all existing copper pipe with cvc pipe post fcv @each combination stp. roof: replace existing copper pipe with black sched 40 pipe.
-
Oct 2020
Fire alarm replacement of existing devices in cosmetically upgraded areas znd new layouts. existing voice evacuation, per floor. existing panel to be tied intp replacement panel during construction.
-
Jan 2021
Install emergency responder radio coverage system.
-
Jan 2021
Revision to existing permit # 20200617-148 ol (included for reference). garage - demolition existing diesel fire pump piping connections. replace eisting electric fire pump controller with new ats controller. replace existing electric jockey pump controller with new controller. replace all sensing lines.
-
Feb 2022
Ref fire alarm permit 202010307891. installation of 2 hr rated, enclosure around. fire alarm conduit to supplement fire alarm permit 202010307891.
-
Jun 2022
13th fl l roof: new guardrail/handrails for floor.
-
Jul 2022
8/f: new guardrail at patio. approx. 6' length.
-
Sep 2022
As built to show descope of fire pump room. original permit 202001091569 no longer has fire pump room scope of work.
-
Sep 2022
Selective demolition & new construction required to connect an existing electrical fire pump at garage level. selective demolition removal of existing diesel fire pump + some walls, doors, mechanical and electrical equipment. new electrical equipment: a new switchgear to be located in switchboard room at garage level.
-
Apr 2023
Fire alarm ti basement fire pump room 202209021794, provide 1 new smoke in existing fire pump room. 3 new modules for monitoring and control of men fsds provide 2 new monitoring points for new fire pump controller.
-
Jan 2026
Fire only- modification of existing fa system. add 1 new fa control relay. add 1 new input module for epo switch.
DBI holds 36 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 36. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update