387–397 Ellis Street
Tenderloin · San Francisco, CA 94102
Permit history
-
Jul 1983
To bring building into fffull compliance with the provisions.
-
Dec 1998
Repair fire damaged plaster, doors, floor coverings &windows.
-
Sep 2000
Misc. fire & water damaged plaster repair in corridors of to three floors. no structural.
-
Jun 2001
Umb: seismic retrofit works, general procedure.
-
Aug 2002
Replacing sidewalk as per report from dpw dated 2/22/02.
-
Mar 2003
Umb special procedure.
-
Apr 2003
Fire sprinkler installation to meet sro. retroactive sprinkler installation ordinance.
-
Feb 2004
As built sprinkler drawings/reference to attached plan 200304021259.
-
May 2004
Umb special procedure structural revision to app $2003/03/26/0733.
-
Jul 2012
At&t has received planning approval to add a panel antennas enclosed in chimney & vent pipes on the existing roof. associated equipment will be located in the basement.
-
Oct 2012
Upgrade 2 restrooms to accessible restrooms on gr fl.
-
Feb 2013
Install one smoke detector in basement control room for an at&t cell site.
-
May 2014
Modification to existing at&t facility of adding 3 new rrus with 3 new a-2 modules attached. adding new fiber and dc power cables to existing innerduct and removing/ replacing an existing dul unit with a new dus-41 unit in existing equipment rack.
-
Dec 2014
To obtain final inspection for bpa #201210041312. all work is complete. compliance with maher ordinance no 155-13 not required.
-
Jun 2017
Att modification: r+r (5)existing antennas with (5)new antennas; remove (2)existing antennas; install (1)new antenna (sector c); r+r existing 18" radomes with 22" radomes; r+r existing rrus; install (4)new rrus; install other small equipment. 8 total antennas. maher na.
-
Jul 2018
Permit to obtain final inspection for work approved under bpa #200304021259 to comply with fire sprinkler ordinance 170-02. all work is complete.
-
May 2020
At&t modification: swap(4)existing antennas; remove (3)existing rrus and install (9) rrus; remove & replace (3)existing 18" radomes with 24" radomes; remove (2) existing strings of batteries; no new batteries proposed.
-
Nov 2022
Modification of an unmanned telecom facility for at&t. remove/replace 6 antennas; r/r (4) frp radomes; remove 3 rru's. install new rf safety, barricades & stripping on roof; remove and replace 20 lead acid batteries within existing cab & rack; install 5 new rectifies & 1 6648 bbu.
-
Dec 2022
Renewal of expired bp#200304021259; no rooms to be removed; all work is complete.
-
Dec 2022
Renewal of expired permit application 200304021259. no rooms to be removed. all work is complete.
-
Jul 2023
As built plans per permit application 202212289306 & 200304021259, requested by field fire inspector.
-
Jan 2024
Structural alteration of subsidewalk basement roof slab to install new accessible curb ramps.
-
Jan 2025
Upgrade fire alarm system to comply with sffc 1103.7.6.1. installation of low frequencey sounders in sleeping areas.
3 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update