468–488 Ellis Street
Tenderloin · San Francisco, CA 94102
Permit history
-
Jul 1983
Additions alterations or repairs.
-
Feb 1985
Repairs and alterations to a portion of the existing.
-
May 1985
To upgrade the existing fire sprinkler system in the build.
-
Jul 1985
Parapet work. related to peermit #533253.
-
Sep 1992
Seismic upgrade incl compliance with h.a. code & elev upgrade.
-
Oct 1993
Reroofing.
-
Feb 1997
Remodel (3)bathrms each at floors 2, 3, & 4.
-
Feb 2001
Ti to existingcommercial space, new finishes, mechanical, electrical.
-
Apr 2001
Streetspace.
-
Aug 2004
Add fire sprinkler for sro hotel and commercial space at groundfloor to use existing service.
-
Feb 2005
Install fire alarm system.
-
Nov 2008
Addition of bathroom, kitchenettes to existing sro congregate bedrooms, plumbing, electrical, mechanical upgrade, new partition walls, voluntary seismic upgrade, finish upgrades. 82 tourist room + 91 residential bedrooms to be revised to 154 residential bedrooms. no tourist rooms.
-
Jan 2011
Installation of a new fire alarm system.
-
May 2011
Fire sprinkler ti. add 287 sprinklers. relocate 382, change out 178 sprinkler heads. total 847 heads.
-
Jan 2012
Tenant improvement to construct phamracy in ground floor commercial space.
-
Nov 2012
Tenant improvement to renovate for new pizza restaurant in existing building vacant ground floor commercial space. installation of type 1 hood. sprinklers, ul300 system separate permits.
-
May 2013
Remodel of tenant suite including demolition & constructionof offices, breakroom, lighting, hvac, finishes & unisex accessible restroom. no changes to building envelope.
-
Aug 2013
Interior remodel of 486-488 ellis st for art gallery use m to a occup. work to include: (2) ada bathrooms, minor partition walls, new lighitng, building is fully sprinklered. full seismic upgrade done under ref permit application 200811076130. all ada to space under permit application 201306179736. sep hvac, sprinkler, life safety.
-
Aug 2013
Modification to existing building. hvac on ground floor to provide (2) new heating 2-pipe fan coil units.
-
Mar 2014
New restaurant in existing tenant space. change of use from pharmacy to restaurant. tenant improvements: construct new walls, plumbing, power, lighting, doors and install new finishes. n/a for the maher ordinance #155-13.
-
Oct 2019
Minor ti to existing open office space & meeting room @ lower level floor & existing break room @ mezzanine floor. this includes cabinet replacements, 7 new pendant lights, replacement passage doors & swing direction of existing front doors. existing hvac system to remain.
-
Dec 2021
Tenant improvement to existing open office space at lower level space. additional scope includes installing drain pan underneath ceiling to address water from units above. new parttion walls, cubicles, drop ceiling at new office.
-
Aug 2023
Replace existing secondary inter lobby entry system @ arlington with new secondary inter lobby entry system, existing assembly sys is operated with door buzzer; new door/window assembly sys will also operate by buzzer or fob. ada approach & access is met with existing assembly system, new sys will meet ada approach & access.
-
Jun 2024
Removal of wallboard in common hallways due to water damage. repair and patch back of finishes under separate permit.
-
Jul 2025
Replace existing secondary lobby entry system with new existing system has fob and buzzer and so will new system.
DBI holds 83 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 83. 11 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update