500–516 Ellis Street
Tenderloin · San Francisco, CA 94109
Permit history
-
Jan 1983
Additions alterations or repairs.
-
Jan 1985
Parapet reinforcement.
-
Apr 1992
New sheetrock on ceiling, patch holes in wall.
-
Nov 1995
Reroofing.
-
Dec 1997
Seismic retrofit - special procedure.
-
Dec 1998
Reroofing.
-
Jun 2003
Reroofing.
-
Jun 2008
Remodel kitchen & bath. (kitchen) countertops, cabinets & sink (bath) toilet & sink. all work in one unit.
-
Sep 2008
Work @ one unit only. remodel kitchen / bath. sink, countertop, cabinets kit. toilet vanity, sink bathroom. no structural work.
-
Feb 2013
Work on one unit - remodel kitchen and 1 bathroom in kind. no lighting change.
-
Dec 2013
Three units - kitchen and bathrooms remodels; to comply with cec150(k) 8 & 10.
-
Nov 2014
One unit -remove existing demolition debris, install cabinets in kitchen and bath, reuse tub, install plumbing and electrical to new unit. paint apartment, install pergo or redo hardwood. maher na.
-
Apr 2015
One unit - remove existing kitchen & bath cabinets. install plumbing and electrical to new remodel. install counters and fixtures. paint apartment. redo hardwood or install vinyl flooring.
-
Sep 2016
Replace existing ground floor store front. remove () awnings and reopen existing transom windows and add new awnings.
-
Aug 2017
One unit: new kitchen cabinet, floor tiles, hardwood floor, new shower wall tiles, toilet, paint unit kitchen and bath.
-
Oct 2017
One unit: replace kitchen counter tops & cabinets, retile bathroom, floor only, replace vanity & toilets. (tub to remain, no rough plumbing work).
-
Mar 2018
Reroofing.
-
Sep 2019
#407 - convert existing kitchen to bedroom, convert closet to kitchen. rehabilitate existing bathroom, install with d.
-
Sep 2019
#302 - convert existing kitchen to bedroom, convert closet to kitchen. rehabilitate existing bathroom, install with d.
-
Oct 2019
One unit - rehabilitate existing bathroom & kitchen. install washer and dryer.
-
Oct 2019
One unit: rehabilitate existing kitchen (approx 56 sq ft.), rehab existing bathroom (approx 40 sq ft.), install washer/ventless dryer under kitchen counter.
-
Oct 2019
Upgrade existing fire alarm to comply with sffc 1103.7.6.1 and nfpa 72.
-
Jun 2021
One unit - rehab 1 kitchen & 1 bathroom in-kind. no structural.
-
Oct 2024
In kind facade repairs per san francisco existing building code chapter 5f and recommended in the facade report prepared for this building.
-
Jul 2025
Scope is epoxy fill cracks, concrete face, and repair mortar joints on masonry.
DBI holds 51 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 51. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update