585 Geary Street
Hotel
-
1912
Built as the Oliver Hotel, mid-priced hotel with 46 1- and 2-room units, to the design of the architects Hladik and Thayer. Six storeys over a basement, reinforced concrete structure, two-part vertical composition, Renaissance/Baroque ornamentation.
-
January 31, 1913
A builder contracted for the gas fitting, plumbing and steam heating of a six-storey and basement class C building, at $7,100. Cross streets: SE corner of Geary Street and Jones.
-
May 1982
Building use: sign.
-
May 1986
Reinforce the parapet.
-
May 1986
Repairs & alterations to rooms, walls, plumbing.
-
Mar 1987
Seven swing door elevator entrances to replace seven slide.
-
Oct 2012
Reroofing.
-
Dec 2014
Floors 2 - 6: replacement of 45 windows at geary st, painting of front exterior facade & selective painting of interior. replace existing windows with wood double hung windows in existing openings.
-
Oct 2015
New attic insulation, r-40 equivalent.
-
Jun 2023
To verify existing sound levels in sleeping areas to comply with sffc section 1103.7.6.1. including the dba readings in each living area and sleeping area of at least 75 dba.
-
May 2024
Repair and normal maintenance for in kind replacement in all units. includes window painting at front facade in and kind window replacement at rear, east, and west elevation.not visiable from street. scope includes new flooring, interior painting, and interior volutary signage.
-
Jun 2024
100% affordable housing: interior work: renovations to mep, fixtures, & arch finishes.interior work is modernization to the units & shared common areas.interior scope to the units includesnewcabinetry, countertops, appliances & replacing plumb fixtures.
-
Mar 2025
Replace fire alarm system to comply with s.f.f.c. 1103.7.6.1. replace existing fire alarm control panel, install a new radio for monitoring, a new led annunciator, install a new remote power supply, replace and install new smoke detectors, new pull stations, install new low frequency sounders in all.
-
Jun 2025
Revision to permit application 202406114202 basement interior work includes replacing flooring, plumbing fixtures and doors. additional work includes 2 new door openings, 1 new partition wall, 1 new cabinet, countertop & sink. mechanical work includes mini split heat pump unit, energy recover ventilator.
-
Feb 2026
Post evac map of building.
2 nominal $1 street-space or sidewalk permits are omitted from the timeline. 5 expired permits are not shown.
Nearby
- 580–598 Geary Street Same street
- 600–606 Geary Street Same street
- 552–556 Jones Street Same block
- 546–548 Jones Street Same block
- 536–544 Jones Street Same block
- 565–575 Geary Street Same block
- 555 Jones Street Around the corner
- 545 Jones Street Around the corner