177–191 Golden Gate Avenue
Store building
-
1916
Built as the Film exchange converted to commercial, storefronts: display windows with vestibules. Two storeys over a basement, reinforced concrete structure, one-part commercial composition.
-
August 23, 1964
Photographed.
-
1989
The Tenderloin AIDS Resource Center, founded in 1985 as the Tenderloin AIDS Network, moved here in 1989 with city funding and served transgender people among its clients.
-
May 1993
Install exhaust fans with switches/timers/install rm to rm louv.
-
Nov 2001
Interior remodel include front door accessibility, flooring upgrade, fixture relocation.
-
Oct 2003
Demolition of existing interior walls/construction of new walls and installation of new flooring.
-
Dec 2010
Tenant improvement, rearrange office plan, remove door, and replace with glazing. remove stairs and replace with new stairs. open walls for wider opening, structural reinforcement. remove existing storefront windows & replace (similar) in-kind. mep under separate permit.
-
Mar 2011
Office ti. exterior: new awning, newlighting to replace, new paint, new storefront, interior: new partition walls, new ada ramp, remove existing door on pharmacy side and replace to match existing.
-
between 2014 and 2016
Judi Iranyi photographed the mural “The Gift You Take is Equal to the Gift You Make” on the Leavenworth Street side of the building at 191 Golden Gate Avenue.
-
Feb 2014
Demolition of existing interior partitions, interior finishes, one exterior entry and interior ductwork. n/a for the maher ordinance #155-13. no penalty per t. venizelos.
-
Feb 2014
Interior renovation of existing office space (8, 156 sq ft). work includes arch., mechanical, electrical, and plmg. mep under seperate permit.n/a for the maher ordinance #155-13; separate structural submission. security gate to be installed in soffit. entry door to be replaced under separate permit.
-
Apr 2014
Replacement of existiing entry door with new; add interior accessible ramp; compliance with ord 155-13 not rquired.
-
Jul 2024
To obtain final inspection for work approved under permit application 200910078483 all work is complete.
-
Feb 2025
Reroofing - remove existing roof material down to sheeting and haul away clean all nails, flashing and haul away provide and install base one layer, glass paper for underlayment, install top layer torch down over base material, subject to cool roof permit program no hot works or torch down.
-
Dec 2025
Demolition (plaster ceiling removal), ceiling framing, drywall installation new 5/8, tapping, mudding & finishing, prime, paint.
-
May 2026
Revision to permit application 202512172006 convert existing 2nd floor restroom into an accessible restroom, extend walls per engineering plans.
-
Aug 2026
Revision to 202512172006 and 202605141263. like for like ceiling removal and leave it exposed. replace wall, floor, and ceiling finishes for offices 102 - 108.
DBI holds 35 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 35. 6 of them are nominal $1 street-space or sidewalk permits. 11 expired or cancelled permits are not shown.
Nearby
- 175 Golden Gate Avenue Same street
- 201–215 Golden Gate Avenue Same street
- 54–70 Mcallister Street Same block
- 60 Leavenworth Street Same block
- 133 Golden Gate Avenue Same block
- 44 Mcallister Street Same block
- 100 Mcallister Street Around the corner
- 140–144 Leavenworth Street Around the corner