277 Golden Gate Avenue
Tenderloin · San Francisco, CA 94102
Permit history
-
May 1982
Additions alterations or repairs.
-
Oct 1989
Modify toilets for handicap accessibility.
-
Jun 1999
Filing for record of parapet reinforcement.
-
Mar 2000
Asbestos mitigation prior to interior work on all floor levels.
-
Mar 2002
Renovate a 5 story building into a 6 story apt building rear deck, parapet.
-
Nov 2004
To renew for final only permit application 200003164511, 9911520.
-
Oct 2006
Renew 98259295 (renovate 5 story building into 6 story apt bldg0.
-
Oct 2007
Revision to appl#9825929-s & 200610195538, change unit count from 92 to 88. revise previously approved site permit 9825929-s, renewed under app#200610195538, for interior renovation to existing building. with new 88 apartments & 1 commercial unit. no change to exterior building. ht. and bulk.
-
Dec 2007
Shoring design for permit application 200710185824. no other work.
-
Feb 2008
Install temporary crane for shoring related to permit application 2007.10.18.5824 (currently under review).
-
Jan 2009
Demolish 5 story office building.
-
Jun 2010
Mta parking only.
-
Feb 2011
Revision to appl #200710185824-r2l relocate roll up gte closer to front garage entrance, new wind screen @ roof deck per plans.
-
Jul 2012
Install fire sprinkler system to new building permit application 2011/02/14/0213.
-
Dec 2012
Revision to permit application 2012-0711-4551. additional of 11 windows sprinkler heads. (3 floors, 11 heads each floor).
-
May 2013
New first time tenant limited restaurant, new hc toilet, counter/equipment and seating area; sprinklers separate permit.
-
Jul 2013
Revision to permit application 2007-1018-5824/r2-front facade revision.
-
Jul 2013
Install new fire alarm system with ifp-1000 control unit in the basement. install notification devices thruout floor areas. install elev recall to comply with a17.1-2004 requirements. tie-in waterflows & tamper switches (inntalled by others) to new panel.2010 nfpa 72 cent sys monit, #201207114551.
-
Aug 2013
Approval/fabrication/installation of emergency evacuation maps for property/construction project, for which construction was permitted under permit application 200710185824, p#1174851 - 16 maps total.
-
Aug 2013
Revision to permit application 2007-1018-5824/r2-4th /5th & 6th floors mezzanine levels-chnage floor framing from concrete metal deck to light guage steel joists system.
-
May 2014
Install split hvac system, fancoil & outdoor condenser, no ducting for 15 units only (#408, 409, 410, 411, 412, 508, 509, 510, 511, 512, 608, 609, 610, 611, 612). compliance with ordiance #155-13 not required.
-
Mar 2015
New elevator control room, all work is interior.
-
Mar 2015
Fire alarm for elevator controller rooms on the roof - 2 new smoke detectors will be installed inside (ne) elev.cont rooms and 6 existing relays will be relocated from () locations to new elev. cont rooms. new smoke detectors will tie-in to existing control unit ref permit application 2015 0302 9677 maher-not req'd.
-
Aug 2020
Temp excavation shoring system for the uc hasting project @ 198 mcallister street. the excavation with cuts up to 30' will be shored using a triple auger soil mixed cut-off wall with soldier beams & tiebacks. ** maher: exempted - approval from dph attached on plan **.
8 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the year the building went up, the architect and builder and the early residents. Submit an update