245 Leavenworth Street
Tenderloin · San Francisco, CA 94102
Permit history
-
Apr 1982
Additions alterations or repairs.
-
Oct 1983
Solar hot water heating system.
-
Jan 2002
Umb - seismic retrofit works-general procedure.
-
May 2004
Renew 200201227440 for umb- seismic retrofit work. general procedure.
-
Oct 2004
Reroofing.
-
Jun 2005
Renew 200408302900 and 200405264839 to complete the work.
-
Apr 2012
Repair deteriorated landings and stairs. (metal). remove rust, prep, prime and paint. update railing (repair work less than 50%). to comply with n.o.v. #201148926, item #3 and 4.
-
Jun 2012
Comply with nov# 201185868 #2 & #6/one unit-remodel the kitchen, new bathroom window, no lighting change.
-
Jun 2012
One unit-remodel the kitchen & bathroom. no lighting change.
-
Feb 2015
One unit remove existing kitchen & bath cabinets, replumb & supply new electrical from new subpanel to new kitchen cabinets. install cabinets and counterts, install tile in shower & floor bath. paint apartment, refinish hardwood.
-
Jun 2015
Remove existing kitchen & bath cabinets, supply plumbing & electrical to new existing locations. install cabinets, counters, fixtures, redo hardwood or supply flooring. maintain fire sepeartion between vinyl units.
-
Aug 2015
One unit: kitchen & bathroom remodel. finishes & fixtures. no walls to be moved, no structural work.
-
Jan 2016
Two units: each unit: kitchen & bathroom remodel. all work in-kind. no change to walls, doors or openings.
-
Feb 2016
Reroofing.
-
Jun 2016
One unit: kitchen & bathroom remodel; like for like.
-
Jun 2016
One unit: kitchen & bathroom remodel; like for like.
-
Aug 2016
One unit - removal of exisitng kitchen & bedroom walls, relocation of kitchen, create new 2nd bedroom in existing suite. remodel existing bathroom as like new fixtures. n/a maher ordinance.
-
Dec 2016
Site permit to add two new accessory dwelling units to basement level per ordinance 162-16. ** maher: n/a **.
-
Jan 2017
#33 1. kitchen and bath remodel as like. no alteration of wall, window and door.
-
Apr 2017
One unit kitchen & bath remodel. no structural. no exterior. like for like. n/a for maher.
-
Sep 2018
One unit. kitchen & bath remodel, no structural, no exterior work. all work within the unit. no work in any common areas. no fire alarm or sprinkler work required. no wall modification. no reframing.
-
Jul 2019
One unit: kitchen and bath remodel. no structural, no exterior work req no change in wall layout. all work within unit no fire alarm sprinkler work req.
-
May 2020
One unit: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire alarm sprinkler work req.
-
Jul 2021
Replacement of existing wood drop beam within the basement.
-
Jan 2022
One unit: kitchen and bath remodel only. no structural/ exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. in kind.
DBI holds 44 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 44. 4 of them are nominal $1 street-space or sidewalk permits.