Jul 1989
Reroofing.
-
Jul 1994
Replace portion of footing wall with reinforced concrete.
-
Apr 1995
Repair fire damage to 5th floor replace burned stai5r srrngr.
-
May 1997
Earthquake hazard mitigation per umb ordinance 225-92.
-
Sep 2006
Replace (1) 4x4 window header & (1) 2x12 ceiling joint damaged by fire in one unit. replace dry wall in three units bathroom only. replace sub floor & linoleum in one unit. replace windows in three units. total 3 windows. windows not visible from street. repair siding in.
-
Apr 2015
#410 - kitchen and bath remodel; to comply with cec150.0(k)3 & 5; redo hardwood or apply vinyl flooring.
-
May 2015
#110- remove kitchen and bath cabinets, supply plumbing & electrical to new remodeled areas, provide counters and fixtures, redo hardwood or replace vinyl flooring. paint apartment. n/a ordinance #155-13.
-
Jun 2015
One unit: remove existing kitchen and bath cabinets, install plumbing and electrical to new existing locations, provide cabinets, counters, fixtures. redo hardwood or provide vinyl flooring. paint apartment. maintain fire separation between units. n/a maher ord. 155-13.
-
Jul 2015
One unit: one kitchen & one bath remodel.
-
Jan 2016
One unit: kitchen & bathroom remodel.
-
Apr 2016
One unit: kitchen & bathroom remodel. replace fixtures in-kind. no walls altered, removed, moved or modified.
-
May 2016
One unit: relocation of kitchen from existing bedroom area, revision to 201604084300; maher n/a.
-
Jul 2016
One unit: kitchen & bathroom remodel. as like, new fixtures.
-
Dec 2016
One unit: kitchen, bathroom & bedroom renovation. using current layout. no structural changes.
-
Aug 2017
One unit: kitchen and bathroom remodel. no structural changes.
-
Mar 2018
To comply with nov# 201724591. repair 4th floor hallways after fire in one of the units, replace affected electrical, replace insulation, drywall & trim.
-
Apr 2018
Two units: kitchen and bathroom remodel.no structural changes. to comply with nov. #201723361.
-
Apr 2018
Two units: kitchen and bathroom remodeling. no structural changes.
-
Apr 2018
Two units: kitchen and bathroom remodel. no structural changes.
-
May 2018
Demolition of wet walls, ceiling 2nd and 3rd floors. removal acm sprayed acoustic ceiling 1st floor comply with 201724591.
-
Aug 2018
To comply with nov#201724591, item #2. replace insulation and drywall trim on floors 1, 2, 3. paint to match, install 12 courtesy outlets and repair all plumbing in walls. reattach existing conduit.
-
Jan 2019
Voluntary replacement of existing fa system with new on one-for one basis, convert new devices to new facu. phase 2 will be on separate permit. ** maher: n/a **.
-
Aug 2019
Add fire sprinkler protection to 4 trash rooms in floors 1-4. no modifications to the rest of the building. total 4 upright f/s, 1 per floor. all work to be done per nfpa 13.
-
Jun 2026
To comply with nov 202652838: repair fire damage in lobby area. same size same location two units: repair 1 window in each unit.
DBI holds 39 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 39. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update