750 Post Street
3-unit building
-
November 26, 1913
Clinton Fireproofing company contracted to put up a two-storey garage, at $25,500.
-
1914
Built.
-
Feb 1984
Additions alterations or repairs.
-
Oct 1984
Install non-bearing partitions.
-
Dec 1994
Awning.
-
Dec 1994
Sign.
-
Nov 2018
Interior tenant demoltion of the 1st & 2nd floors of an existing 2 story office building at 750 post st. each project floor area is approximately 11, 000 sq ft ab-017.
-
Feb 2019
Exterior facade improvements & interior ti, including retail area, open office, private offices, conference rooms, training rooms, beak room & support areas. new ada compliant restrooms. mep/fire/life safety under separate permit.
-
Apr 2019
Add new underground and overhead fire protection system at existing building.
-
May 2019
Ref permit application 20190212565; install new hvac system.
-
Jul 2019
(4) evacuation plaques.
-
Jul 2019
Title 24 plans. arch app#201902112565. n/a for maher.
-
Aug 2019
New fa system - ref 201902112565 fa system pathway survivablity level, provide wireless cellular, provide smk detection for fsd actuation, provide audio/visual appliance throughout the bld provide elevator interface for elevator.
-
Nov 2019
As built for pa 2019-0805-7863 add 5 smoke detectors, 2 high power control relays.
2 nominal $1 street-space or sidewalk permits are omitted from the timeline. 2 expired permits are not shown.
Nearby
- 726–728 Post Street Same street
- 775 Post Street Same street
- 729 Jones Street Same block
- 845 Sutter Street Same block
- 861 Sutter Street Same block
- 871 Sutter Street Same block
- 711 Leavenworth Street Around the corner
- 720 Jones Street Around the corner